
9 Maintenance
37
9.1
Maintenance schedule
9.1.1
One-time maintenance after initial operation
Note:
The following maintenance tasks need only be performed after initial
operation at this interval.
9.1.2
Daily maintenance work
Maintenance work
After the
first
25 hours
Change engine oil.
Check the valve clearance,
set to 0.10 mm when the en-
gine is cold. *
* Have these tasks carried out by the service
department of your Wacker Neuson con-
tact person.
Maintenance work
Daily before
operation
Daily after
operation
Check the intake area of the
combustion air and cooling
air.
Check engine oil level.
Check water separator.
Check fuel tank:
- Fuel level.
- Leaks.
- Lines for leaks.
- Check the tank seal for
leaks – change, if neces-
sary.
Check the air cleaner mainte-
nance indicator while the en-
gine is running.
Clean or replace the filter ele-
ment as needed.
Check that Bowden cable
moves freely.
Clean the machine.
Содержание DPU 3050H
Страница 1: ...5200001077 05 0811 5 2 0 0 0 0 1 0 7 7 Operator s Manual Vibratory Plate DPU 3050H DPU 3750Hts EN...
Страница 46: ...9 Maintenance 46 8 Close filler hole and use a torque wrench to tighten it to 100 Nm...
Страница 48: ...9 Maintenance 48 11 If necessary retighten the screws...
Страница 60: ...13 Technical data 60...
Страница 62: ......
Страница 63: ......