![WACKER Group 0007174 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/wacker-group/0007174/0007174_operators-manual_866382037.webp)
PT 6 /...
Maintenance
wc_tx000567gb.fm
35
5.11 Pump Housing Mounting Bolts
See Graphic: wc_gr003178
Tighten the mounting bolts
(a)
on the pump housing after the first 50
hours of operation. Inspect the bolts periodically thereafter and tighten
when required. Torque the bolts to 330 Nm (243 ft. lbs.).
wc_gr003178
a
Содержание 0007174
Страница 1: ...Pump PT 6 OPERATOR S MANUAL 0154629en 006 0107 0 1 5 4 6 2 9 E N...
Страница 2: ......
Страница 11: ...PT 6 Safety Information wc_si000098gb fm 9 2 7 Label Locations wc_gr001145 1 3 7 6 3 8 10 9 5 6 4 12 11 2...
Страница 17: ...PT 6 Technical Data wc_td000099gb fm 15 3 5 Dimensions wc_gr001154...
Страница 27: ...PT 6 Operation wc_tx000261gb fm 25 wc_gr003210 3 1 2 e g 3 1 2 d a b c f...
Страница 41: ...PT 6 Maintenance wc_tx000567gb fm 39 wc_gr003206 a b g c d d e e f g g e f g 0 15 0 75 mm 0 005 0 025 in...
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......