WAC Lighting
www.waclighting.com
Phone (800) 526.2588 • Fax (800) 526.2585
Headquarters/Eastern Distribution Center
44 Harbor Park Drive • Port Washington, NY 11050
Phone (516) 515.5000 • Fax (516) 515.5050
Western Distribution Center
1750 Archibald Ave • Ontario, CA 91761
Phone (800) 526.2588 • Fax (800) 526.2585
WAC Lighting retains the right to modify the design of our products at any time as part of the company's continuous improvement program. MAy, 2014
INSTALLATION INSTRUCTION
Line™ LED Edge Lit Task Luminaire
LN-LED
SAFETY INSTRUCTION
IMPORTANT: NEVER attempt any work without shutting off the electricity.
•
Read all instructions before installing.
•
Always turn off the power at fuse box prior to installation to prevent electrical shock.
•
To be installed by a qualified electrician.
•
System is intended for installation in accordance with National Electric Code and local regulations.
•
Consult with local inspector to assure compliance.
•
Keep away from combustible materials such as plastic or paper products.
•
Do not operate with missing or damaged parts.
PRODUCT INCLUDES
•
Docking station
•
LED light panel
•
“I” Connector
•
Mounting screws
INSTALLATION
1.
Choose the proper mounting position for the fixture, recommended either at the back or front of the cabinet.
2.
Fasten the docking station to surface using the provided mounting screws.
3. Snap the LED light panel onto the docking station by aligning the circular handles on the panel to the magnets in
the circular holes on the docking station.