Vynco OLSEN445E Скачать руководство пользователя страница 2

INSTALLATION INSTRUCTIONS

VYNCO.CO.NZ

OLSEN445E - 4FT EMERGENCY DUAL COLOUR INTERIOR BATTEN

STEP 10

STEP 8

STEP 9

STEP 4

STEP 5

STEP 6

STEP 7

STEP 3

STEP 1

STEP 1 
Isolate mains power.
 
STEP 2 
Press snap-on buttons and remove diffuser.

STEP 3
Unplug power connection.

STEP 4
Feed mains cable through grommet in base tray / 
conduit side entry according to desired application.
 
STEP 5

Mark and drill fixing holes.

 

STEP 6

Securely fix base to the ceiling. 

STEP 7
Terminate mains cable into terminal block 
and securely clamp.

STEP 8

Connect the DC plug, select colour temperature.

STEP 9
Fix cover to base and ensure all 4 clips engage.

STEP 10
Restore mains power and test to ensure 
correct operation.  
 
 

INSTALLATION PROCEDURE

STEP 2

STEP 2

LSW

L

SWITCHED

EARTH

NEUTRAL

N

EMERGENCY / 

SWITCHED ACTIVE

Отзывы: