
INSTALLATION INSTRUCTIONS
VYNCO.CO.NZ
OLSEN445E - 4FT EMERGENCY DUAL COLOUR INTERIOR BATTEN
STEP 10
STEP 8
STEP 9
STEP 4
STEP 5
STEP 6
STEP 7
STEP 3
STEP 1
STEP 1
Isolate mains power.
STEP 2
Press snap-on buttons and remove diffuser.
STEP 3
Unplug power connection.
STEP 4
Feed mains cable through grommet in base tray /
conduit side entry according to desired application.
STEP 5
Mark and drill fixing holes.
STEP 6
Securely fix base to the ceiling.
STEP 7
Terminate mains cable into terminal block
and securely clamp.
STEP 8
Connect the DC plug, select colour temperature.
STEP 9
Fix cover to base and ensure all 4 clips engage.
STEP 10
Restore mains power and test to ensure
correct operation.
INSTALLATION PROCEDURE
STEP 2
STEP 2
LSW
L
SWITCHED
EARTH
NEUTRAL
N
EMERGENCY /
SWITCHED ACTIVE