4
VUTEC CORPORATION
2741 N.E. 4
th
Avenue
Pompano Beach, FL 33064
TEL: (954) 545 9000 - FAX: (954) 545 9011
E-MAIL:
LectricI&III-Rev E 06/18/2008
OPERATION
Notice: The initial hook-up and calibration procedures are intended to be performed by a qualified service man.
Install the switch in a desired location and connect the wires per either wiring diagrams shown.
Wirings must conform to local and/or national electrical codes and regulations.
Dashed wirings shown by installers. Wirings must be of minimum 18-AWG. Install ring terminal provided to ground
wire and attached to screw with ground symbol located on motor bracket.
Press “
DOWN
” on the switch and the screen will travel down to its lower limit and stop automatically.
Press “
UP
” on the switch and the screen will travel up to its upper limit and stop automatically.
The control switch should be left in the center “
OFF
” position when operation has completed.
See
Limit Switch Operation
for adjustments of the upper and lower limits. This information can be found on Vutec
Website at
www.vutec.com
.
WIRING DIAGRAM - 120VAC
ACCESSORIES INCLUDED
1
SPDT TOGGLE SWITCH
1
COVER PLATE FOR SWITCH
3
MOUNTING BRACKETS WITH SCREWS