GR SERIES GAS FRYERS - REMOVAL AND REPLACEMENT OF PARTS
F25125 (March 2003)
Page 7 of 24
5.
Remove the capillary tube retaining and packing
nuts, from the bottom of fry tank.
6.
Remove screws securing capillary tube
mounting clips to the fry tank heat tube then
remove capillary tube.
7.
Reverse procedure to install.
MAIN BURNERS
WARNING:
DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES.
WARNING:
SHUT OFF THE GAS BEFORE
SERVICING THE UNIT.
1.
Open fryer door.
2.
Remove main burner shipping ties (if installed).
NOTE:
All shipping ties should be removed during
installation. Do not replace for normal operation.
3.
Lift main burner up and tilt the top of burner
toward fry tank until it clears the gas orifice at
the bottom.
A.
Lift main burner from fryer.
NOTE:
The main burners mount to the fryers’ burner
mounting bracket by shoulder bolts that rest in the
keyway slot.
Содержание GR25
Страница 18: ...GR SERIES GAS FRYERS ELECTRICAL OPERATION F25125 March 2003 Page 18 of 24 SCHEMATIC DIAGRAM Millivolt Controls ...
Страница 19: ...GR SERIES GAS FRYERS ELECTRICAL OPERATION F25125 March 2003 Page 19 of 24 WIRING DIAGRAMS Millivolt Controls ...
Страница 21: ...GR SERIES GAS FRYERS ELECTRICAL OPERATION F25125 March 2003 Page 21 of 24 Frymate Dump Station ...