background image

– 10 –

PL-41145

WATER QUALITY

The water supply connected to this pasta cooker should contain no more than 2.0 grains of hardness
per gallon with pH from 6.5 to 8.0.  This degree of hardness and pH can easily be obtained with the use
of a properly maintained water softener.

Water supplies vary from one location to another.  A local water treatment specialist should be
consulted before installing the pasta cooker.

Untreated water contains scale producing minerals which can precipitate onto the surfaces in the
cooker and its components.  This can result in early component failure and reduced product life.

Strainers and filters will NOT remove minerals from the water. Refer to DELIMING in this manual.

DRAIN CONNECTIONS

The pasta cooker 1" NPT Discharge Drain Pipe must be connected to the floor drain of the installation
site.

1. For standard discharge connection, using 1" NPT pipe directing the discharge drain from the

front of the cooker straight down into the floor. An alternate rear drain diverter method may also
be used. It is recommended that when using the diverter method a 1" capped tee be installed
for ease of cleaning. This method  entails 1" pipe and fittings from the discharge at the front of
the unit to a rear drain. It will be necessary to use a combination of 1" tee, elbows and nipples
to access the drain location (the installer must determine what will be required).

PLUMBING CONNECTIONS

WARNING:

  PLUMBING CONNECTIONS MUST COMPLY WITH APPLICABLE SANITARY, SAFETY

AND PLUMBING CODES.

A

 3

/

4

" (19 mm) male hose connection is provided at the rear of the pasta cooker.  On single body pasta

cookers GPC12, the water connection hookup is located in the rear of the cooker, in the leg channel
of the base frame.  Note that the GPC12 models have only a hot water valve on the front control panel;
therefore, it is recommended that the hot water rear connection hookup be used.

The double body pasta cookers GPC12S, have hot
and cold water valves and should be hooked up
utilizing the appropriate rear connections as shown in
Fig 2.

A water hammer arrestor (meeting ASSE-1010
Standard) must be supplied (by other than Vulcan-
Hart Company) in the water supply line at the service
connection.

Fig. 2

MODEL GPC12S

Содержание GPC12

Страница 1: ...ON OF ITW FOOD EQUIPMENT GROUP LLC F 31173 Rev A 02 04 INSTALLATION OPERATION MANUAL For additional information on Vulcan Hart or to locate an authorized parts and service provider in your area visit...

Страница 2: ...N THE EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE V...

Страница 3: ...System 8 Leveling the Pasta Cooker 8 Flue Connections 9 Electrical Connections 9 Plumbing Connections 10 Water Quality 10 Drain Connections 10 OPERATION 11 Before First Use 11 Controls 12 Using the P...

Страница 4: ...ling pasta quickly It is the same width as the pasta cooker Model No Tubes BTU Input Width GPC12 3 90 000 151 2 394 mm GPC12S 3 90 000 31 787 mm Standard Features include stainless steel tank sides do...

Страница 5: ...he swivel head attached Look for the swivel head in the tank of the cooker and screw it onto the faucet before hooking up the water LOCATION Do not install pasta cooker next to a deep fat fryer becaus...

Страница 6: ...Ontario Canada M9W 1R3 4 Canadian Electric Code CSA Standard C22 2 No 3 latest edition Copies may be obtained from The Canadian Standards Association 178 Rexdale Blvd Etobicoke Ontario Canada M9W 1R3...

Страница 7: ...st transmission of strain to the connector as specified in the appliance manufacturer s instructions Attach the restraining device at the rear of the oven Fig 1 Provide a gas line strain relief to lim...

Страница 8: ...checked for leaks all piping receiving gas should be fully purged to remove air GAS PRESSURES AND ORIFICES The standard orifices are set at 4 W C Water Column 1 kPa manifold pressure for natural gas a...

Страница 9: ...ventilated to the outside of the building through a ventilation system installed by qualified personnel Information on the construction and installation of ventilating hoods may be obtained from the s...

Страница 10: ...method may also be used It is recommended that when using the diverter method a 1 capped tee be installed for ease of cleaning This method entails 1 pipe and fittings from the discharge at the front...

Страница 11: ...he Pasta Cooker 1 Use a non corrosive grease dissolving commercial cleaner to clean the protective metal oils from all surface parts and the tank interior 2 Follow the cleaner manufacturer s direction...

Страница 12: ...s are supplying heat warming water in tank per thermostat HIGH LIMIT When lit there is not enough water in the tank system has shut down MANUAL FILL VALVES Model GPC12 has one hot water fill valve Mod...

Страница 13: ...is is not done the tank walls can be damaged Warpage can cause leaks Turning the Pasta Cooker ON 1 Fill the pasta cooker tank to the water fill level line on the back wall which is approximately 5 127...

Страница 14: ...If the pilot still fails to light contact a qualified Vulcan Hart service representative 5 Make sure the tank is full of water 6 Turn the thermostat control knob to the desired setting Turning the Pas...

Страница 15: ...y vary 1 Fill tank with hot water to correct level 2 Turn thermostat to BOIL 3 Bring water to full rolling boil With Basketlift 1 Turn the timer to the desired setting 2 Set basket on basketlift arm 3...

Страница 16: ...cold water to fill line you may wish to add ice Do not fill above fill line 2 Stir often to help quickly lower the temperature of the pasta Other foods such as corn on the cob may be cooked in the pas...

Страница 17: ...is provided at the front of the tank Fig 13 and a fill port spray nozzle is provided at the right rear of the tank just above the fill line Fig 14 The overflow skim port serves two functions 1 Allows...

Страница 18: ...r The GPC12S will have a hot and a cold valve handle Fig 15 The left handle of the GPC12S controls hot water flow to the cooker and the right handle controls cold water flow to the rinse station To st...

Страница 19: ...to clean the space at the rear section of the battery between the cooker and the rinse station a Insert the brush into the opening and run brush up and down along the opening to remove any debris tha...

Страница 20: ...lubricated VENT Annually when pasta cooker is cool check the flue and clear any obstructions DELIMING The pasta cooker MUST be delimed periodically depending upon usage every 3 4 weeks Follow the deli...

Отзывы: