background image

— 3 —

Installation, Operation and Care of

MODEL ES, EL & ET STEAM JACKETED KETTLES

KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE

GENERAL

Your Vulcan steam jacketed kettle is produced with quality workmanship and material.  Proper
installation, usage and maintenance will result in many years of satisfactory performance.

Vulcan-Hart Company suggests that you thoroughly read this entire manual and carefully follow all of
the instructions provided.

INSTALLATION

Prior to installation verify that the electrical service agrees with the specifications on the machine data
plate located inside the front cover at the lower left.

UNPACKING

This kettle was inspected before leaving the factory.  The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment.  Immediately after unpacking, check
for possible shipping damage.  If the kettle is found to be damaged, save the packaging material and
contact the carrier within 15 days of delivery.

LOCATION

Position the kettle in its final location.  Check that there are sufficient clearances for operating and
servicing the kettle, and for proper clearance of the cover when raised.  The kettle draw off faucet
should be located near a floor drain.

LEVELING

Place a spirit level on the rim of the kettle with the cover open.  Adjust the feet to level the kettle left-
to-right and front-to-back.

INSTALLATION CODES AND STANDARDS

Vulcan kettles must be installed in accordance with:

In the United States:

1. Local codes.

2. National Electrical Code ANSI/NFPA-70 (latest edition).

Содержание EL40

Страница 1: ...ES30 ML 52643 EL40 ML 52644 ES60 ML 52645 EL80 ML 52646 ET100 ML 52647 ET125 ML 52648 ET150 ML 52649 VULCAN HART COMPANY P O BOX 696 LOUISVILLE KY 40201 0696 TEL 502 778 2791 FORM 30965 8 97 Formerly...

Страница 2: ...8 Periodic Maintenance 8 Pressure Relief Valve 8 Low Water Cut Off 8 Sight Glass Assembly 8 Draw Off Valve 8 Vent 8 Kettle Jacket Fluid 8 SERVICE 9 General Notes 9 Servicing Procedures 9 Thermostat 9...

Страница 3: ...the factory The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment Immediately after unpacking check for possible shipping damage If the kettle is fo...

Страница 4: ...conduit The box is a sealed box and the conduit connection should be made with fittings of the water resistant type Be sure the supply wiring and the circuit protection are adequate for the K W load...

Страница 5: ...are for cooking the lower ones for holding At the higher dial settings the steam pressure in the jacket will drop to 2 to 21 2 psi after the thermostat cuts the power off and before it cuts it on Low...

Страница 6: ...lve is in a fully open position This food draw off valve system requires a right or left turn to close off food flow To allow for evenly mixed food products to flow into a food service pan or stock po...

Страница 7: ...cleaning and lubricating make sure the body and plug numbers match before reinserting the tapered plug 7 Examine the valve plug and valve body for nicks and deep scratches Do not attempt to push or fo...

Страница 8: ...oint one half the height of the glass Extreme murkiness indicates the kettle jacket should be cleaned 4 Draw Off Valve The faces of this valve should be lubricated with Petro Gel daily to prevent stic...

Страница 9: ...single pole switches SERVICING PROCEDURES WARNING DISCONNECT ELECTRICAL POWER SUPPLY AND PLACE A TAG AT THE DISCONNECT SWITCH TO INDICATE THAT YOU ARE WORKING ON THE CIRCUIT Thermostat To recalibrate...

Страница 10: ...nuts which anchor the mounting bracket for the unit The cut out and cut in pressure setting of the switch is shown on the dial and is adjustable with slotted square shanks at the top of the case Adjus...

Страница 11: ...nd the light and between the metal ring and the inner surface of the control box wall Replace Pressure Gauge Disconnect the copper tubing from the back of the gauge remove two nuts holding the U strap...

Страница 12: ...ief valve 3 4 15 Lb 1 FP 84 16 3 4 x 1 2 reducing bushing 20 833239 Air vent 3 4 1 21 833238 Vacuum breaking check valve 1 2 1 22 FP 83 92 Cross 3 4 1 23 FP 54 27 3 4 close nipple 1 24 FP 54 08 1 2 cl...

Страница 13: ...Ph 208 240 60 3 836805 Contactor 50A Use on 18 36 KW 240 60 3 and 2 24KW 208 60 1 836806 Contactor 60A Use on 18 36KW 208 60 3 and 2 43 2KW 208 240 60 3 881654 Contactor 40A 3P Use on 18 24KW 480 60 3...

Страница 14: ...14 WIRING DIAGRAM...

Страница 15: ...15 WIRING DIAGRAM...

Страница 16: ...16 WIRING DIAGRAM...

Страница 17: ...17 WIRING DIAGRAM...

Страница 18: ...32 311 16 13 305 8 323 4 61 8 14 321 2 35 103 4 451 2 61 131 2 63 8 113 4 81 4 181 2 EL40 40 33 24 36 29 141 2 36 311 16 13 305 8 323 4 61 8 14 321 2 35 103 4 451 2 651 4 131 2 63 8 113 4 81 4 181 2...

Страница 19: ...19 NOTES...

Страница 20: ...20 NOTES FORM 30965 8 97 Formerly 990202 PRINTED IN U S A...

Отзывы: