SERVICE PROCEDURES AND ADJUSTMENTS

 Certain procedures in this section require electrical test or measurements while

power is applied to the machine. Exercise extreme caution at all times and follow Arc Flash
procedures. If test points are not easily accessible, disconnect power and follow Lockout/Tagout
procedures, attach test equipment and reapply power to test.

INFINITE SWITCH TEST (208V/

240V)

 Disconnect the

electrical power to the machine and
follow lockout / tagout procedures.

NOTE: 

 Refer to AI3829 in WIRING DIAGRAMS for

switch terminal locations.

1.

Remove FRONT PANEL.

2.

Connect a voltmeter to the output terminals H1
and H2.

3.

Reconnect power to machine.

4.

Turn knob to the desired setting.

5.

Compare the percentage of ON time to OFF time.

NOTE: 

 ±7.5% tolerance allowable.

Knob
Setting

% on Time

Seconds
on

Seconds
off

Hi

100

ALL

0

Med.

48

15

15

Low

37

8

14

Med. Low

28

7

24

Very Low

7

3

33

6.

If the percentage is not correct, replace the
switch as outlined under INFINITE SWITCH / 3
HEAT SWITCH.

3 HEAT SWITCH TEST (480V)

 Disconnect the

electrical power to the machine and
follow lockout / tagout procedures.

NOTE: 

 Refer to AI3830 in WIRING DIAGRAMS for

switch terminal locations.

1.

Remove FRONT PANEL.

2.

Reconnect power to machine.

3.

Check input voltage at L3 and L2 on the switch
terminals.

4.

Check for the correct output voltage at the output
terminals for all knob settings of the switch.

Knob Settings

L3 Input -

Output at
Terminal(s)

L2 Input -

Output at
Terminal(s)

High

1 & 3

2

Med

1

2

Low

1

3

5.

If the voltages are not correct, replace the switch
as outlined under INFINITE SWITCH / 3 HEAT
SWITCH.

RACK SPRING TENSION

ADJUSTMENT

1.

Access the springs on the bottom of broiler.

2.

Tighten nut to adjust rack spring tension. Adjust
both springs equally so there is approximately
3/4" of thread above the nut. If additional rack
spring tension is required, tighten each nut an
additional 2-3 turns.

3.

Check for proper operation.

SALAMANDER ELECTRIC BROILER - SERVICE PROCEDURES AND ADJUSTMENTS

Page 9 of 14

F45545 (0315)

Содержание 36ESB

Страница 1: ...o perform the procedure Procedures for which you do not have the necessary tools instruments and skills should be performed by a trained Vulcan Service Technician The reproduction transfer sale or oth...

Страница 2: ...NFINITE SWITCH 3 HEAT SWITCH 6 RACK SPRINGS 7 HEATING ELEMENTS 7 SERVICE PROCEDURES AND ADJUSTMENTS 9 INFINITE SWITCH TEST 208V 240V 9 3 HEAT SWITCH TEST 480V 9 RACK SPRING TENSION ADJUSTMENT 9 HEATIN...

Страница 3: ...ID POSITION AND HEAT CONTROL SETTING For detailed information refer to OPERATING THE BROILER and GRID ADJUSTMENT in the Installation Operation Manual MODELS Vulcan 36ESB 208 36ESB 240 36ESB 480 SPECIF...

Страница 4: ...um of NFPA 70E CAT III 600V UL CSA TUV listed Sensitivity of at least 20 000 ohms per volt Meter leads must also be rated at CAT III 600V Clamp on type amp meter for measuring heating element current...

Страница 5: ...PANEL Disconnect the electrical power to the machine and follow lockout tagout procedures 1 Remove crumb tray 2 Remove FRONT PANEL 3 Position the rack assembly to access panel screws in the broiler o...

Страница 6: ...nel screws in the broiler opening area Remove screws from this area and the front of panel Fig 5 6 Remove screws securing right side panel to broiler Slide panel toward the front of broiler until pane...

Страница 7: ...prings 4 Access the bottom of broiler and remove springs from the lower arm casting and eye bolt Fig 9 5 Reverse procedure to install 6 Perform RACK SPRING TENSION ADJUSTMENT HEATING ELEMENTS Disconne...

Страница 8: ...ack assembly and drip tray on each side to support the tray and remove from broiler Fig 12 6 From inside broiler cooking area remove screws securing heating element to broiler Fig 13 7 Note wire locat...

Страница 9: ...percentage is not correct replace the switch as outlined under INFINITE SWITCH 3 HEAT SWITCH 3 HEAT SWITCH TEST 480V Disconnect the electrical power to the machine and follow lockout tagout procedures...

Страница 10: ...NOTE Checking current draw is the preferred method over a resistance check when a clamp on type amp meter is available 1 If both measured values are approximately the same as listed in the machine in...

Страница 11: ...des connections for supply voltage to the broiler SEQUENCE OF OPERATION NOTE On 208V 240V broilers the two heat controls are Infinite load switches On 480V broilers the two heat controls are 4 Positio...

Страница 12: ...208 240V WIRING DIAGRAM Fig 16 SALAMANDER ELECTRIC BROILER ELECTRICAL OPERATION F45545 0315 Page 12 of 14...

Страница 13: ...480V WIRING DIAGRAM Fig 17 SALAMANDER ELECTRIC BROILER ELECTRICAL OPERATION Page 13 of 14 F45545 0315...

Страница 14: ...heat switches 480V are OFF or malfunctioning 3 Heating elements inoperative or malfunctioning Cooking problems product not done overdone 1 Refer to Installation Operation Manual for recommended grid...