6
Step 3:
Tighten the center screw by pushing it in and turning it clockwise to fix
it in position.
Step 4:
Insert two
LEGS
into part
A2
of the
CHALKBOARD/DRY-ERASE
BOARD
(A)
and two
LEGS
into the bottom of the
SUPPLIES TRAY (B).
The
LEGS
will lock into place.
A
SSE
m
BL
Y INS
TRUC
TIONS