4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 9: Replacement Procedures
Page 185
9.10
Separator Replacement
9.10.1
Safety
Use lockout / tagout procedures prior to starting work.
9.10.2
Removing and Inspecting the Separator
See Figure 9-34.
1.
Turn OFF power to the VST Control Panel at the Power Switch located on the front of the VST
Control Panel. (The power, ground, and neutral will be completely disconnected from the
GREEN MACHINE
).
2.
Follow lockout-tagout procedures prior to starting work.
3.
Unlock the hasps and remove the cover from the GREEN MACHINE.
4.
Remove the two 45° flare tubing connections from the separator, being careful not to
damage the copper tubing.
5.
Remove the 90° and straight pipe fittings from the existing separator for reuse.
6.
The existing separator can be discarded.
Figure 9-34: Separator Location