OSPZX225-EN
9/10
INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS
OPERATION
AIR SOURCE
• Use the filtered dry air (less than 40 ).
• Extra attention is needed where it's cold climate
(below 5 °C).
• When air pressure is high, reduce it to standard
pressure (0.4 to 0.7 MPa). Air pressure should not
exceed 0.7 MPa during operation test.
• Capacity of compressor and air tank are to be
calculated by capacity of piping and air consumption.
A margin of 30% is required.
TEST OPERATION
Check the operation of pneumatic actuator before
fluid enters the piping.
Double-acting type Stop the air from the air source.
Release the residual pressure
in the air cylinder. Open the air
equalizer. Move the manual
shaft of actuator with a wrench.
Single-acting type Send the standard pressure air.
Confirm the opening / closing
operation by slowly moving the
actuator.
TESTING
After piping, check following points.
• Piping is correct.
• Air or fluid leakage from connection. Flow
direction of air is correct.
• Air pressure is in the range.
• Nothing interferes with operation when limit
switch or solenoid valve is attached.
ATTENTION
The opening and closing operation of the pneumatic
actuator is fast, which may affect the product life.
Please adjust the operation time of pneumatic
actuator using a speed controller.
Valve size [mm]
Adjustment of operation time.
Less than 040
More than 1 second
050 or more
More than 2 seconds
MANUAL OPERATION
• Double-acting; stop the air supply and do not leave
the air inside of cylinder.
• Single-acting; cannot be operated manually.
Optional code with the handle: TAO-MT / TAC-MT.
• Before automatic operation, be sure to remove
wrench.
OPERATION (PND / TAD)
After turning air pressure to 0, turn manual shaft
slowly with a smooth-jawed wrench to check the
direction of OPEN/SHUT position.
PND
TAD
MAINTENANCE
• Do the routine maintenance at least once in half a
year.
• Do not set or take spring unit parts apart after
installing the pneumatic single-acting actuator.
Can be used with no oil supply.
• Confirm the air leakage.
• Confirm the air supply pressure.
• Confirm the dirt or grit inside of cylinder.
Lubrication Procedure (TAD / TAO / TAC)
In case of lubricating, use turbine oil or the
equivalent through a lubricator. (ISO VG 32.46).
Once lubricate, do the regularly.
Inspection items
• Confirm operation of opening and closing.
• Confirm whether screws are loose or not.
• Confirm the fluid temperature or pressure.
• Confirm the leak from valve stem.
• Confirm the bolt tightening torque.
Manual shaft