background image

 

 

You  now  have  the  Main  Chassis  sitting  on  the  4  feet.  This  is  a  good  time  to 
make sure that the table is positioned correctly.  If it must be moved slightly or 
centered  on  its  stand, do  it  slowly.  Now, peel off the paper on the top of the 
main chassis. 

 We shipped the suspension with air installed.  If you need to add 

air, use a bicycle pump.

 

 

 

You  have  the  newest  HR-X  type  platter  and  bearing  assembly.    Remove  the 
tape covering the platter bearing and place the platter on the spindle. Carefully 
lower  the  platter  down  onto  the  spindle.    Spin  the  platter  and  check  that  it  is 
spinning freely and that there is no wobble. 

 

 

It  is  very  important  that  the  platter  be  level.    Place  a  12"  long  bubble  level 
across  the  platter.    Level  the  platter  in  two  directions,  90  degrees  apart.  
Rotating the black cone shaped feet on the bottom of the four legs will level the 
unit.  You must hold the bladders when doing this.  

 

 

Now  place  the  Flywheel  in  position.   The  left  side  of the TNT 5 has a cutout 
where the Flywheel will be centered. Place the motor in its proper location as 
shown  in  the  “Proper  Layout  for  Flywheel  Usage”  diagram.    Make  sure  you 
have  a  level  surface  of  at  least  32  inches  in  length.    VPI  makes  a  custom 
extended top for the TNT stand to put the TNT-5 on. 

 

PROPER LAYOUT FOR FLYWHEEL USAGE

 

 

Distance between motor and flywheel, center to center = 140mm +/- 2mm   
 
 

 

 

 

140 mm +/- 1 mm 

 
 
 
 
 
  
 
 
 
 
 
 
 

 

   MOTOR 

 

    FLYWHEEL 

 

 

Отзывы: