background image

The turbine should not be exposed to excessive water pressure and/or water flow velocity, which

must not exceed the safe maximum value of 11 m/s.

The user must read and follow this and the inverter's manual before starting the installation.

The user must follow all the installation and connection instructions provided in the inverter's

user's manual.

The following items are not included in your purchase: 

1. intake screen (-s)
2. pipe flange
3. pipes

4. power cables. 

GETTING READY

Upon receipt of the turbine, unless purchased from and installed by the authorized Vortex Hydrokinetics

LLC distributor/dealer, make sure that all boxes are not damaged. 

Check part conformity with the delivery list and ensure there are no damaged or defective parts; should

there be any, please inform Vortex Hydrokinetics LLC immediately.

The parts are manufactured by their respective manufacturers for Vortex Hydrokinetics LLC. Do not

contact these manufacturers directly in an attempt to resolve any issues as it could void our limited
lifetime warranty to you unless specifically authorized by Vortex Hydrokinetics LLC.

RECYCLE! Any packing materials should be disposed of via correct waste disposal methods. Do

not discard waste materials into the environment.

The following parts are normally shipped in separate boxes:

Assembled turbine

Bridge rectifier

Inverter

Vortex Hydrokinetics LLC © 2019 

SETUR-M User's Manual -  Rev. 2M-A

Page 13 of 24

Содержание SETUR-L

Страница 1: ...SETUR m Hydraulic Vortex Turbine user s manual Vortex Hydrokinetics LLC 2019 SETUR M User s Manual Rev 2M A Page 1 of 24...

Страница 2: ...the turbine Vortex Hydrokinetics LLC will not be liable for it DISCLAIMER UNLESS SPECIFICALLY AGREED TO IN WRITING VORTEX HYDROKINETICS LLC a MAKES NO WARRANTY AS TO THE ACCURACY SUFFICIENCY OR SUITAB...

Страница 3: ...SAFETY HAZARDS Although SETUR turbine uses bladeless rotor the main spherical rotor is a potential mechanical safety risk When the turbine is operating the rotor performs precession movements at a re...

Страница 4: ...ORTANT Ensure that you have followed the cable sizing requirements to ensure that the correct size of transmission cable has been selected If a cable of insufficient cross sectional area is used heat...

Страница 5: ...mage Make sure all fasteners are installed and properly tightened Do not operate or work on the equipment if mentally or physically impaired or after consumption of alcohol or drugs Under no circumsta...

Страница 6: ...ted lifetime warranty 9 Warranty exclusions 9 Procedures for obtaining warranty service 11 Serial numbers 12 Regulations and compliance 12 Installation 12 Requirements 12 Getting ready 13 Electrical w...

Страница 7: ...nternational awards since 2008 including Ecological Oscar E On Energy Globe Award in 2014 SETUR turbine is a versatile power generation system suitable for a wide range of applications It can be succe...

Страница 8: ...kW Rated voltage AC 50 Hz EU 60 Hz USA 1 phase 240 V EU 120 V USA Maximum continuous output current 8 A Generator type Permanent magnet generator h 1 m or v 4 m s 65 l s Water flow intake free flow o...

Страница 9: ...place those which have proven defective in materials or workmanship The product owner is responsible for the payment at current rates for any service or repair outside the scope of this limited warran...

Страница 10: ...thorization in writing Under no circumstances will Vortex Hydrokinetics LLC be responsible for any refund or remuneration exceeding the original purchase price of the product less any shipping fees Vo...

Страница 11: ...to ship your item Vortex Hydrokinetics LLC will not accept any shipments without a RMA number 5 Pack the item in its original box or another well protected box as will be outlined in the Return Shippi...

Страница 12: ...ia a pipe Turbine must be installed in clean water free of any corrosive and dangerous chemicals as well as debris Turbine can be installed either vertically or horizontally Turbine must be safely ins...

Страница 13: ...sure that all boxes are not damaged Check part conformity with the delivery list and ensure there are no damaged or defective parts should there be any please inform Vortex Hydrokinetics LLC immediat...

Страница 14: ...r do not touch it until it has cooled down to ambient temperature The turbine is equipped with a waterproof power connector located on the generator enclosure It consists of a bulkhead connector attac...

Страница 15: ...roller and system monitoring solution in one device WARNING An electric shock can be fatal High danger due to grid voltage and voltage from the turbine that is operational SYSTEM WIRING Each SETUR M i...

Страница 16: ...ed injured or killed due to connecting this system by yourself and or disregarding the warnings and instructions provided in this and inverter s user s manuals or if you connect this equipment incorre...

Страница 17: ...much for you if there is no head or gradient there is no flow velocity there is no power If you double the head you double the power available Higher hydraulic head is the least expensive way to gene...

Страница 18: ...ater into a canal with a small dam to create some head Obviously water that is not moving has no energy in it And water that is being pumped is not a source of renewable energy since it takes more ene...

Страница 19: ...city by 0 85 For smooth muddy sandy or smooth bedrock conditions multiply the velocity by a correction factor of 0 9 9 The corrected velocity multiplied by the cross sectional area yields the flow rat...

Страница 20: ...ments of head flow and distances Protection of the turbine from slides debris excessive water pressure and other physical damage Permitting and regulatory issues Freezing conditions i e ice plugging s...

Страница 21: ...chance of fish leaves debris etc entering the turbine Your local wildlife protection authorities might have specific requirements as to the size of the mesh screen Please refer to any rules and regula...

Страница 22: ...or mill Whatever your mounting choice is the SETUR turbine must be safely attached to a solid structure that prevents any movement slippage fall or detachment It is best to wait until your turbine ha...

Страница 23: ...ach or touch the turbine during the operation Always shut down the turbine before any maintenance work COMMISSIONING Check and if necessary tighten all fasteners and electrical contacts before deployi...

Страница 24: ...spare parts and repairs contact Vortex Hydrokinetics LLC 1825 NW Corporate Blvd Ste 110 Boca Raton FL 33431 USA Tel 1 561 801 7698 Fax 1 561 807 9058 e mail support vortexhydro com Vortex Hydrokinetic...

Отзывы: