45
54. Pull the heat exchanger straight upwards from
the cooling water pipes and the cooling water hose.
Replace the O-ring on the heat exchanger and the
sealing rings on the cooling water pipes.
55. Remove the cooling water pipe between the ex-
haust manifold and the oil cooler. Tool width: 10 mm.
56. Remove the exhaust manifold. Tool width: 13
mm.
57. Pull off the hose (1) from the carburetor and re-
move the screw holding the oil dipstick tube. Tool
width 1/2".
58. Remove the fuel pipe from the fuel pump. Tool
width: 12 mm.
59. 251DOHC, AQ171. Pull off the vacuum hoses
(1) from the intake manifold and the cold starting de-
vice as well as the connection (2) from the magnetic
valve on the carburetor.
Содержание 230
Страница 1: ...Engine 230 250 251DOHC AQ131 AQ151 AQ171 Workshop Manual 2 0 C ...
Страница 2: ......
Страница 27: ...25 AQ131 AQ151 230 250 ALT 1 ...
Страница 29: ...27 230 250 ALT 2 ...
Страница 31: ...29 AQ171 251DOHC ALT 1 ...
Страница 33: ...31 251DOHC ALT 2 ...
Страница 99: ...97 References to Service Bulletins Group No Date Regarding ...
Страница 100: ...98 Notes ...
Страница 102: ...7732007 5 English 05 1999 ...