background image

Charging Curve

 

 

 
 
 
 
 
 
 
 
 
 
 
 

 

Bulk:

 This is the first charging stage where the battery at low charge stage, typically 10%, receives the majority of its 

charge. During this stage the battery brought to about 95% of its charger getting 100% of the available solar power.   
 

Pulse (Maintenance):

 At the end of bulk stage, typically when the battery reach 14.4 Volts, a maintenance mode 

starts where the battery voltage can float between an high and low value fixed by the controller. These values are 
temperature compensated in order to keep the battery at 100% charge stage in any condition. 
 
 

Protection functions

 

Overcharge

 

protection 

Deep

 

discharge

 

protection 

Battery

 

under

 

voltage

 

protection 

Solar

 

panel

 

reverse

 

current

 

protection 

The

 

following

 

installation

 

faults

 

do

 

not

 

destroy

 

the

 

controller.

 

After

 

correcting

 

fault,

 

the

 

device

 

will

 

continue

 

to

 

operate

 

correctly: 

Overcharge

 

protection 

Deep

 

discharge

 

protection 

Reverse

 

polarity

 

protection

 

of

 

load,

 

panel

 

and

 

battery 

Automatic

 

electronic

 

fuse 

Short

 

circuit

 

protection

 

of

 

load

 

and

 

panel 

Over

 

voltage

 

protection

 

at

 

panel

 

input 

Open

 

circuit

 

protection

 

without

 

battery 

Reverse

 

current

 

protection

 

at

 

night 

Overload

 

protection 

Battery

 

over

 

voltage

 

shutdown 

 

 
Maintenance

 

The

 

controller

 

is

 

maintenance-free.

 

We

 

strong

 

suggest

 

that

 

all

 

components

 

of

 

the

 

PV

 

system

 

must

 

be

 

checked

 

at

 

least

 

annually, 

Ensure

 

adequate

 

ventilation

 

of

 

the

 

cooling

 

element 

Check

 

the

 

cable

 

strain

 

relief 

Check

 

that

 

all

 

cable

 

connections

 

are

 

secure 

Tighten

 

screws

 

if

 

necessary 

Terminal

 

corrosion 

 

 
 
 
 

 

Содержание ISC1000

Страница 1: ...Installation and Operating Instructions Solar System Controller ISC1000...

Страница 2: ......

Страница 3: ...oller 3 Do not connect any defective or damaged measuring equipment 4 Follow the general and national safety and accident prevention regulation 5 Never alter or remove the factory plates and identific...

Страница 4: ...lluminate orange battery is weak voltage of battery is 11 5 12 5V Illuminate red battery is empty voltage of battery is below 11 5V LED Question Illuminate red polarity of battery is connected in wron...

Страница 5: ...and insert dowels 2 3 Fix the controller to the wall with the cable openings facing downwards using 4 oval head screws M4x35 DIN 7996 Install the solar system and operating mode Connect the wires in...

Страница 6: ...voltage protection Solar panel reverse current protection The following installation faults do not destroy the controller After correcting fault the device will continue to operate correctly Overchar...

Страница 7: ...rgy Remedy Wait till battery is charged Load output is switched off due to excessive load current Remedy Reduce load current if necessary switch off or disconnect loads Check loads Load output is swit...

Страница 8: ...should not be disposed of with household waste Please recycle where facilities exist Check with your local authority or retailer for recycling advice Specifications are subject to change without prio...

Отзывы: