
14
and stored properly and prevented from the direct sunshine and rain.
Before installation, check if there is any component missing according
to 1.1 product standard configuration and check whether the box
appearance is intact;
Carefully handling the unpacking. Protect the insulated coating on the
case surface;
Check the LFP battery for damage after unpacking. If there is any
damage, contact
Voltacon
or your reseller.
5.3 The preparatory work
1.
Make sure the POWER buttons of all batteries are OFF.
2.
Ensure the charging voltage of power supply equipment is DC57.5
±
0.1V;
3.
All power supply should be off.
5.4 Installation
5.4.1 Install the battery
The E-BOX SERIES can be installed either vertically or horizontally.
In this chapter, instructions here are only for horizontal installation such
as: installation in a 19-inch cabinet. Vertical installation is similar. All
equipment must be placed steadily after installation.
5.4.2 Connect Ground cable
Unscrew the screw at the grounding hole on the front panel of the
battery, wrap the ground cable around the screw, and tighten it with a
screwdriver. Connect the other end of the ground cable to a reliable
ground point.
External Bi-polar over current protection devices and Bi-polar
external isolator shall be equipped.
The minimum diameter must be >=6mm
2
.
Voltacon 5.12kWh Lithium Battery User Manual