Volt-E DMTC22KW Скачать руководство пользователя страница 1

Model DMTC22KW 
Domestic Charger AC 22kW                                                                                                                                     

 

 

 

 

 

 

 

Version 2.0 

 

Model DMTC22KW  

Domestic Charger AC 22kW 

 

 

 

 

 

 

 

 

Installation and Use Guide

 

 

Содержание DMTC22KW

Страница 1: ...Model DMTC22KW Domestic Charger AC 22kW Version 2 0 Model DMTC22KW Domestic Charger AC 22kW Installation and Use Guide...

Страница 2: ...Model DMTC22KW Domestic Charger AC 22kW Domestic Charger AC 22kW DMTC22KW Installation and Use Guide VOLT E Rua do Pinhal 23 25 Sequeira Braga 4715 002 Telem vel 351 939 250 522 Email geral volt e pt...

Страница 3: ...ight to make changes without prior notice to the equipment or to the equipment specifications set out in this instruction manual COTTON CONSTELLATION LDA provides its customers with the latest version...

Страница 4: ...location where the equipment is to be placed national electrical codes and standards Failure to do so may result in serious injury or even death For safety reasons and to help ensure equipment complia...

Страница 5: ...ce Required 17 4 Installation 17 4 1 Rainwater Drainage 17 4 2 Wall Mounting 18 4 3 Spinning 19 5 Operation 22 5 1 How to connect 22 5 1 1 Basic software 22 5 1 2 Management software 24 6 Configuratio...

Страница 6: ...one of the products The equipment you have purchased may differ in appearance Useofthesymbols DANGER Indicates extremely important safety precautionary instructions which if not strictly followed will...

Страница 7: ...all or use the charger near flammable explosive rough or combustible chemical or vapor materials To avoid the risk of fire or electric shock do not use the charger with an electric extension cord The...

Страница 8: ...is broken or has any other anomaly or if it stops working Charging with a worn or damaged cable can cause burns or start a fire Charging with a worn or damaged cable can cause burns or start a fire C...

Страница 9: ...l component The details of the Station s appearance may vary slightly depending on the date and production model 2 1 Assembly drawing Depth 12cm Perspective view and dimensions of the DMTC22KW Loader...

Страница 10: ...D Reader 3 Designation of Product 6 Type 2 socket 7 Charger status indicator lights This equipment can be placed on the wall or on a pedestal The wall bracket is supplied by Volt E together with the c...

Страница 11: ...easily installed outdoors and indoors with public and private access to charge all EV brands on the market in Mode 3 according to the European standard IEC 61851 1 through Built in Type 2 charging soc...

Страница 12: ...ity of the card reader Ethernet TCP IP communication protocol for remote monitoring and configuration 4G Modem For locations where wired communications are not efficient 2 5 Specifications and Technic...

Страница 13: ...les Technical Data DMTC22KW Standard Power AC input Phases Lines Mono Three phase L1 L2 L3 N PE Voltage 220V 380V Frequency 50Hz Nominal power input 7 32 A Wattage 7 22kW AC output Voltage 220V 380V P...

Страница 14: ...ion protocol OCPP 1 6 Local of installation Indoor Outdoor Altitude Up to 1000m Environmental conditions Operating Temperature 45 C up to 45 C Storage temperature 45 C up to 45 C Humidity 10 90 Mechan...

Страница 15: ...AN access Connectivity can be achieved through three options 1 Wireless 2 2 LAN network cable 3 SIM card 4G module USB and Ethernet input 2 5 2 RFID System RFID cards are an international standard ISO...

Страница 16: ...power emissions power input equipment 16A per phase IEC 61000 3 3 Electromagnetic compatibility EMC Part 3 3 Limits Limitation of voltage changes voltage fluctuations and flicker in public low voltag...

Страница 17: ...MC Part 4 6 Test and measurement techniques Immunity to disturbances induced by radio frequency fields IEC 61000 4 8 Electromagnetic compatibility EMC Part 4 8 Test and measurement techniques Immunity...

Страница 18: ...of the charger against any electrical risk it is mandatory to install a main circuit breaker MCB and a residual current device RCD upstream of the charger These electrical protections and the rest of...

Страница 19: ...act your electricity distributor for more information The dimensioning of the charger input power line must be checked by a qualified technician It is important to note that several factors such as th...

Страница 20: ...ctional life it is important to take precautions when selecting the installation location Operational life and performance will be influenced by the selected installation location and the respective o...

Страница 21: ...ample ladders or overhanging car tires The equipment must not be exposed to direct spray water for example adjacent manual washing installation high pressure cleaner garden hose The equipment must be...

Страница 22: ...ocket It is important to note that national regulations may limit this height 4 Installation Before installation make sure you have studied all related drawings and are familiar with all installation...

Страница 23: ...wall surfacesurfs surface The use of appropriate fixing devices guarantees the correct equipment functioning of the equipment Wall mounting plate After correctly adjusting the vertical position of the...

Страница 24: ...ional The DMTC22KW charger can be applied to a pedestal and fixed to the floor If you want this option check with the manufacturer Volt E 4 3 Spinning Completely turn off the power during the entire w...

Страница 25: ...he manufacturer Check the protection between the supply and the equipment Check the earth supply Check that all screws are tight Check that the AC power cable breakers are turned off during operation...

Страница 26: ...k that all power supply switches are turned off and that the connection of the charging unit to the external circuit breaker is correctly established Check that the emergency button is activated Opera...

Страница 27: ...ic shock which can cause death or serious injury Attention Read the manual carefully before connecting the charger Follow all installation operation and maintenance instructions throughout the mechani...

Страница 28: ...ress Next to proceed Swipe the RFID card After swiping the RFID card the following information will appear on the screen Card ID minutes available for charging minutes discounted on the current chargi...

Страница 29: ...p Swipe the RFID card again to stop charging and for a refund of discounted minutes that have not been used 5 1 2 Management Software OCPP connection with client server optional This protocol allows c...

Страница 30: ...1 Uninstall application for basic software and OCPP management software To uninstall the Charging Station you need to enter the hidden menu To enter the hidden menu return to the standard home menu a...

Страница 31: ...ppear on the screen Force Stop Clear Data Clear Cache and Clear Defaults After following these steps press the Uninstall option and the following menu will appear on the screen if the Uninstall option...

Страница 32: ...all the Android application for basic software and OCPP management software Press on the option Home and then on Solid Explorer When opening access My files and choose the pen where the software is lo...

Страница 33: ...while the application is being installed The message App installed will appear when the installation is complete After following the step by step to install the application follow the instructions in...

Страница 34: ...u To enter the hidden menu return to the standard home menu and click 2x in the lower left corner and enter the default password The default password is 436174 You can change this password later In th...

Страница 35: ...output values Click on AC1 to configure To define the maximum voltage in Max Voltage enter 230 the minimum voltage click on Min Voltage put 180 the maximum current in Max Current put 32 The number of...

Страница 36: ...ntered in the previous field Click OK to save the new password Click C to cancel the option and return to the initial configuration menu Keep the new password saved correctly otherwise you will lose a...

Страница 37: ...heck the box before ReadBoard for Firmware version information To switch between the two loading plates of the model with two output sockets click on the content field 1 Click Back to return to the in...

Страница 38: ...he desired value and press Enter After entering the value press Enter To format RFID cards To use the RFID card loading software you need a recent Windows computer If the computer has an old version o...

Страница 39: ...Model DMTC22KW Domestic Charger AC 22kW 34 Click twice one IC Deposit enter the password 123456 and select Ok After clicking Ok the following window will appear...

Страница 40: ...a new card Click on Check to see the card balance Click Clear to clear the card balance Select Deposit to add balance to the card Inside the software folder there is a file called Key Este ficheiro t...

Страница 41: ...o the address of the OCPP server Activate the OCPP enable selecting Do not change ANYTHING on the Remote Control nor on its address Click Enter to save 6 6 Ethernet Connectivity Cable RJ45 When necess...

Страница 42: ...s Android Settings Choose the Option Android Settings Menu Wireless Networks Choose the menu Wireless Networks Enable Wi Fi Ensures that the Wi Fi network interface is OFF Restart the equipment Physic...

Страница 43: ...erface is ON Select the network On the right side select the SSID of the network you want to connect to And authenticate with the network password Disconnect the Ethernet network Disconnect the RJ45 n...

Страница 44: ...arameters is the way to guarantee the stations access to this private network which is not accessible through the normal internet network This chapter intends to demonstrate how to configure the mobil...

Страница 45: ...isconnect the RJ45 network cable from the Android controller module Display and connect it to your laptop In this way he connected the 3G 4G module to his personal computer Ensure connectivity Check i...

Страница 46: ...he System Settings form and in the Mobile Network Settings group change the fields APN APN Account and APN Password Enter the data provided to you by the operator Leave the APN Account and APN Passwor...

Страница 47: ...step c and confirm that the data you have entered is changed After selecting the Status menu you can check if the 4G section is now online Disconnect the interface Wi Fi So that the station does not t...

Страница 48: ...in adverse environmental conditions such as excessive dust accumulation See the following table for maintenance recommendations Operation Frequency Estimated Time Visual verification of the installati...

Страница 49: ...t charging check the emergency stop button Turn the emergency button off to allow the charger to function normally 7 3 Connection inspection This type of equipment is for electric vehicles and the AC...

Страница 50: ...peration and maintenance of the charger contact the Volt E technical support service Please go to our official page for more information on the extra technical support package and other customer suppo...

Страница 51: ...ed by non certified third parties violation of Void seals The product is NOT repaired or serviced by a third party either on property or during the contract period The product is NOT transferable to t...

Страница 52: ...ng or customer failure to follow the normal operating procedures described in this installation and use manual Damage resulting from not respecting the ventilation distance according to the section 3...

Отзывы: