10.1 RELATED DOCUMENTS

 

 BS 5440 

PARTS 1 & 2 

FLUES & VENTILATION REQUIREMENTS 

  BS 5449 

PART 1 

FORCED CIRCULATION OF HOT WATER SYSTEMS 

  BS 5482 

PART 1 

DOMESTIC BUTANE & PROPANE GAS BURNERS IN PERMAMENT DWELLINGS 

  BS 5546 

 

INSTALLATION OF GAS HOT WATER SUPPLIES FOR DOMESTIC PURPOSES  

  BS 6798 

 

INSTALLATION OF BOILERS OF RATED NOT EXCEEDING 60kW

SECTION 10 - LPG INSTRUCTIONS

10.6 CHECKING THE CO

2

 AND ADJUSTING THE 

GAS VALVE

THE GAS VALVE MUST BE SET-UP OR ADJUSTED WITH 

THE AID OF A PROPERLY CALIBRATED FLUE GAS ANA-

LYSER.

Isolate the appliance from the electrical supply and remove 

the appliance casing as described in 4.7.1. Set the flue gas 

analyser to read CO

2

 and insert the probe into the flue analysis 

test point (

Y1-Z1 

fig. 40). Restore the electrical supply to the 

boiler and switch the boiler to the OFF mode.

Have access to the printed circuit board, locate and open the 

closing plug on the dash board 

(L2 

fig. 43

)

, locate and press 

the CO

 

button (see fig. 43 pos. SW1). The appliance will now 

operate in CO

2

 mode for approximately 15-minutes.

10.6.1 CO

2

 FUNCTION SETTINGS

Locate the CO

 

button (see 7.3)

Select the main selector switch in position 

10.3 CONVERTING THE APPLIANCE GAS TYPE

To convert the appliance to another gas type it is necessary to 

change the injector and adjust the gas valve (CO

2

). 

 To change the injector see 6.12.1

 To replace the flange on the silencer (only Vision 30C) see 6.15

 To adjust CO2 values see 10.6

10.4 GAS SUPPLY

The gas supply must be connected to the appliance by a com-

petent LPG installer and must be of sufficient size to supply 

the appliance at its maximum output. An existing supply must 

be checked to ensure that it is of adequate size to deal with 

the maximum rated input of this and any other appliances that 

it serves.

10.5 GAS SUPPLY INSTALLATION

The entire installation including the meter must be purged and 

checked for gas tightness.

10.2 TECHNICAL DATA

Gas Pressures

Vision 25C

Vision 29C

Inlet pressure

37.0 mbar

37.0 mbar

Heating maximum gas rate (kg/hr)

1.55

1.94

DHW maximum gas rate (kg/hr)

1.94

2.25

Minimum gas rate (kg/hr)

0.39 

0.47

Injector size

3.9 mm

4.3

Silencer flange

27 mm (fitted)

29 mm 

CO2 @ maximum output (%)

10.5

10.5

CO2 @ minimum output (%)

10.5

10.5

CO @ maximum output (ppm)

190

250

CO @ minimum output (ppm)

20

25

CO

2

 FUNCTIONS

ACTION ON THE BUTTON

DISPLAY

combustion analysis mode

press once = burner running at maximum heating

ACO

   

gas valve maximun setting

press twice = burner running at maximum DHW

ACO

 

 

gas valve minimum setting

press three time = burner running at minimum

ACO

   

 

Содержание Vision 25C

Страница 1: ...ctions THESE INSTRUCTIONS TO BE RETAINED BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems...

Страница 2: ...4 Flue system 13 3A 5 Air supply 14 3A 6 Water circulation 14 3A 7 Electrical supply 14 3A 8 Mounting on a combustible surface 14 3A 9 Timber framed buildings 14 3A 10 Inhibitors 14 3A 11 Showers 14...

Страница 3: ...atically Dear Customer Your Vok ra Vision boiler has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use and e...

Страница 4: ...shows the temperature values Pressure gauge shows the current pressure of your heating system the gauge should be set between 1 and 1 5 BAR When the appliance is oper ating the gauge may rise or fall...

Страница 5: ...e ADVANCE ON fun ction is active Displayed when the ADVANCE OFF fun ction is active Displays current minutes past the hour Displays current hour of the day 24 hour clock in 30 minute segments lar ge s...

Страница 6: ...ay of week setting procedure NOTE the time of day is shown on the display and is also indicated on the 24 segmented display as a flashing segment 1 4 CHANGING THE HEATING PATTERN The built in clock is...

Страница 7: ...e programmed heating pattern AUTO ON Heating is in an ON period according to the programmed heating pattern MAN OFF Heating is being controlled manually and is switched constantly OFF MAN ON Heating i...

Страница 8: ...a period of at least two minutes before re setting the appliance 2 6 EXPLANATION OF FEATURES Although the Vok ra Vision has been designed for simplicity of use it utilises the latest in boiler techno...

Страница 9: ...1 Ignition failure flame not sensed internal fault Final Reset check appliance operation A02 Limit thermostat fault Final Reset check appliance operation A03 Fan tacho signal fault Final Reset check a...

Страница 10: ...on open vented systems This booklet is an integral part of the appliance It is therefore necessary to ensure that the booklet is handed to the person responsible for the property in which the applian...

Страница 11: ...the boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the appliance pump and fan may continue to operate to dissipate any residual heat within the...

Страница 12: ...mum system volume 74 litres Pre charge pressure 1 bar 2 5 Dimensions Vision 25C Vision 30C Height mm 715 Width mm 405 Depth mm 248 Dry weight kg 27 28 2 6 Clearances Vision 25C Vision 30C Sides 12mm T...

Страница 13: ...to the roof flashing As determined by the fixed collar of the vertical terminal R To the side of a boundary 300 mm S To the side of an opening or window on a pitched roof 600 mm T Below an opening or...

Страница 14: ...n vessel to accom modate the increased volume of water when the system is heated It can accept up to 8 litres of expansion from within the system generally this is sufficient however if the system has...

Страница 15: ...ted on a wall of combustible mate rial there is no requirement for a sheet of fireproof material to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed bui...

Страница 16: ...An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at least 1 metre above the highest point in the system and at least 5 metres abov...

Страница 17: ...see2 9 Areductionmustalsobemadetothemaximumlength see table below when additional bends are used Reduction for additional bends Bend Reduction in maximum flue length for each bend 45 bend 1 3 metre 60...

Страница 18: ...REAR FLUE fig 15 rear flue outlet only Using the template provided mark and drill a 125mm hole for the passage of the flue pipe The hole should be drilled LEVEL to ensure any condense fluid that form...

Страница 19: ...required number of flue extensions or bends up to the maximum equivalent flue length between the boiler and vertical flue assembly see fig 14 Ensure that any horizontal sections of the flue system hav...

Страница 20: ...flue kit for termination The horizontal terminal is supplied with a built in converter box and cannot be shortened A 130mm hole is required for the passage of the concentric terminal through the wall...

Страница 21: ...can be used for connection to the electrical supply Connect the fly lead to a fused plug or fused isolator in the following way brown wire to LIVE supply blue wire to NEUTRAL supply green yellow to E...

Страница 22: ...e the electrical supply to the appliance is switched on Ensure any external controls are switched to an ON position and are calling for heat Move the selector switch to the ON position the appliance w...

Страница 23: ...CORRECTLY AND IS PROPERLY SECURED ENSURE ALL PIPE WORK IS RE CHECKED FOR TIGHT NESS RE FIT APPLIANCE CASING COMPLETE BENCHMARK CHECKLIST FOR UK ONLY Complete details of the boiler controls installatio...

Страница 24: ...the reverse order 6 7 LOWER AUTOMATIC AIR RELEASE VALVE fig 28 Carry out component removal procedure as described in 6 4 Remove the expansion pipe locking pin B from the pump as sembly and remove the...

Страница 25: ...tion taking care to Fig 34 6 13 ELECTRODES fig 34 Carry out component removal procedure as described in 6 4 Remove the air chamber front cover Disconnect the electrode leads and ancillary wiring from...

Страница 26: ...removal procedure as described in 6 4 Remove the locking pin Q1 that secures the cover R1 to the hydraulic manifold Using a hooked piece of wire carefully withdraw the by pass cartridge S1 and or DHW...

Страница 27: ...unscrew the inlet connection Unscrew the nut E2 Lift the DHW flow switch housing from its seating If necessary remove the locking pin F2 from the DHW flow switch taking care not to lose the float con...

Страница 28: ...5 C and 55 C respectively the boiler will fire on minimum 25 power until the primary thermistor exceeds 55 C Thereafter the pump will over run for a period of 30 seconds 7 2 3 HEATING MODE With the se...

Страница 29: ...deemed as immediately dangerous 7 5 CHECKING THE EXPANSION VESSEL Carry out the component removal procedure as described in 6 4 You must ensure that the boiler is completely drained of water Using a...

Страница 30: ...pletion of any task that required the disconnection and re connection of any electrical wiring or component these checks must be repeated 7 8 FAULT FINDING Before attempting any faultfinding the elect...

Страница 31: ...essed in hundreds e g 25 2 500 rpm GAS VALVE CALIBRATION Connect the boiler to the power supply Open the gas tap Set the function selector to OFF RESET monitor off Remove the screws E remove the casin...

Страница 32: ...ATION To set the temperature regulation curve locate potentiometer P3 By turning P3 the curve is shown on the LCD display The user can adjust the temperature of the heating system indirectly by changi...

Страница 33: ...e connected via a controls interface which enables a connection to be made directly on the PCB at plug CN6 see Fig 8 2 OTHER DEVICES Contact the controls manufacturer and or Vok ra technical departmen...

Страница 34: ...pressure switch S E Spark electrode TSC2 Ignition transformer 3W 3 way motor F O H T Flow over heat thermostat FS Flue sensor FT Flow thermistor NTC RS Return thermistor NTC brown CN3 blue F Hv 1 2 7...

Страница 35: ...THE APPLIANCE GAS TYPE To convert the appliance to another gas type it is necessary to change the injector and adjust the gas valve CO2 To change the injector see 6 12 1 Toreplacetheflangeonthesilence...

Страница 36: ...3 However if the CO2 reading is incorrect the minimum gas pressure must be adjusted as follows locate the minimum adjustment screw fig 44 using a suit able screwdriver remove the protection plug using...

Страница 37: ...ALL INSTALLATIONS If required by the manufacturer record the following CO2 OR CO ppm OR CO CO 2 Ratio The heating and hot water system complies with the appropriate Building Regulations Yes The boile...

Страница 38: ...Signature SERVICE 7 Date Energy Efficiency Checklist completed Yes No Engineer Name Company Name Telephone Number CORGI ID Number Comments Signature SERVICE 9 Date Energy Efficiency Checklist complet...

Страница 39: ......

Страница 40: ...s vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve the...

Отзывы: