background image

 

 

 
 

 
LIST OF ITEMS: 

 

Lift,  

 

Adapter,  

 

Ceiling closing panel (frame),  

 

Button switch,  

 

Mounting template,  

 

Mounting instruction manual,  

 

Assembly kit 

 

 

 

 

1.

 

INSTALACJA: 

A.

 

Choose the lift mounting site on fixed ceiling, using the 
template (transport plate A). Drill holes and install 
expansion plugs (from the kit). 

 

B.

 

Raise the lift and screw to the fixed ceiling in sites marked 
as B. 

 

 
 

C.

 

Install the universal projector holder, using screws (from 
the kit) 

 

D.

 

Install the projector and adapter on the SLIM lift. 

 

SLIM LIFT 

Projector lift 

 

SLIM 12/1640 

 

SLIM 10/3250 

   

 

1/5 

 

Содержание SLIM 12/1640

Страница 1: ...unting site on fixed ceiling using the template transport plate A Drill holes and install expansion plugs from the kit B Raise the lift and screw to the fixed ceiling in sites marked as B C Install the universal projector holder using screws from the kit D Install the projector and adapter on the SLIM lift SLIM LIFT Projector lift SLIM 12 1640 SLIM 10 3250 1 5 ...

Страница 2: ...es Tighten the nuts larger ones on elements D I The projector and adapter must be mounted as on the illustration elements F must be below element E J Small nuts G 3 pcs are used to adjust the projector s position in three axes 2 MONTAŻ PANELA ZAMYKAJĄCEGO A Panel zamykający H zainstalować do podstawy windy SLIM Przykręcając go w 4 miejscach użyj śrub nakrętek i podkładek z zestawu montażowego B Sy...

Страница 3: ...PANEL A The lift may be connected to 230 V power mains only by personnel with appropriate licenses and according to the circuit diagram 4 MANUAL PROGRAMMING A Programming the upper and lower position of the SLIM lift 3 5 ...

Страница 4: ...of the lift are now saved Caution Make sure not to accidentally click buttons and which will cause the lift to close and reopen bypassing the programmed settings of the end position switches F SAFEGUARDS A THERMAL SAFEGUARD switches the engine off after 4 minutes of continuous lift operation After the engine has overheated and switched off automatically leave the window for ca 10 15 minutes before...

Страница 5: ...ft model After mounting the equipment before first use check if it is mounted as per the instructions and level If the equipment is not level adjust the mounting Do not use equipment that is not properly installed Do not modify or unscrew elements of the equipment as this may cause a risk of permanent damage to the equipment and or the safety of the users WARRANTY CONDITIONS The warranty period fo...

Отзывы: