background image

 

 

 
 

 
 
 
 
 
 
Programming the safety threshold of the engine load. 
Before switching on the power, connect together 3 wires responsible for the potential-free control (A, B. GND) 
Turn on the power. 
The motors drive down twice (to the lower end position) and up (to the upper end position). The programming is 
completed automatically after the actuators have completed the full two Bottom-Up cycles. 
After programming, switch off the power supply and open the wires responsible for the potential-free control (A, B. GND). 
Don't stop or touch  when programming CP-lift, let it make full movement cycle. 
 
ATTENTION 
The emergency shutdown of the engine under load only works when driving up and beyond the angle of 22 degrees (from 
the bottom vertical position) 

3.

 

 ELECTRIC CONNECTION - CONTROL DIAGRAM: 

 

Manufacturer: VIZ-ART Automation 

tel.+48 22/6138899         www.viz-art.eu

 

 
 
 
 

5/6 

 

Upper control – Closing adjustment 

When turned clockwise - Less 
When turned counterclockwise – More

 

Lower control –Opening adjustment 

When turned clockwise - More 
When turned counterclockwise - Less

 

Содержание CP-LIFT Series

Страница 1: ...control cables in POTENTIAL FREE CONTROL wire Use the diagram electrical connection g Take off the Locking Plate and remove the transport protection and the White Masking Plate masking plate h After removing components needed to next steps of installation close the CP lift by connecting WHITE BLUE control cables in POTENTIAL FREE CONTROL wire 9 Unplug CP lift wires from supply 2 INSTALLATION and A...

Страница 2: ...t 2C Attach the 2 elements of the TV bracket C to the Display LCD TV mounting points Ensure that the screws are inserted at same level in both bracket elements PLEASE NOTE The safety of users and devices depends on the proper installation of the lift and TV Select the fastening screws for the TV in accordance with the TV manufacturer s recommendations B C 2 6 ...

Страница 3: ...e center so that the television is located in the central part of the arm D c Carefully close the lift ensuring that the TV is hidden symmetrically in the CP lift Locking Plate which protects the TV after the lift closes d Tighten the lock screws E with a hex key e Connect power supply cable and signal cables to the TV through the opening F in the housing of the CP LIFT lift attach them to the hou...

Страница 4: ...FT LIFT LIFTS OPEN SETTING 1 Open the lift to the desired position and adjust the Lower limit switch to a expected TV position use a size 10 hex key 2 By turning the key in the direction you increase the lift opening angle max 100 while turning it towards reduces the lift opening angle LIFT CLOSING SETTING 1 Open the lift and adjust using the Upper limit switch 2 Turning towards closes more the li...

Страница 5: ...ower supply and open the wires responsible for the potential free control A B GND Don t stop or touch when programming CP lift let it make full movement cycle ATTENTION The emergency shutdown of the engine under load only works when driving up and beyond the angle of 22 degrees from the bottom vertical position 3 ELECTRIC CONNECTION CONTROL DIAGRAM Manufacturer VIZ ART Automation tel 48 22 6138899...

Страница 6: ...lift is mounted and stable original auxiliary elements dedicated for the specific lift model After mounting the equipment before first use check if it is mounted as per the instructions and level If the equipment is not level adjust the mounting Do not use equipment that is not properly installed Do not modify or unscrew elements of the equipment as this may cause a risk of permanent damage to the...

Отзывы: