manualshive.com logo in svg
background image

 

 

VXH1004 

INSTALLATION GUIDE

 
 

 

PAGE 2 of 2

 

 

 

 

 

 

PULL LEVER MOUNTING 

  Find a proper location near the driver seat and install the pull control lever using two self-tapping screws (not 

provided). 

 

Run the pull control wire trough the dashboard to the engine compartment and connect the wire to the switch 
lever on the horn. Do not bend or twist the wire during this process.

 

ADJUSTING THE PULL LEVER 

  Place the control lever in the stand-by position. 

  Release lever clamp screw, pull out the wire 

tube and cut it to a suitable length. (Do not 
detach the wire from the control lever). 

  Install the tube again and affix the lever clamp 

screw. 

  Tighten the horn clamp screws, keeping the 

wire a length of four centimeters past the end 
of the tube. 

  Affix the end of the wire to the switch lever and 

tighten the horn clamp screws again. 

 

ADJUSTING VOLUME 

 

Release the horn clamp screws and move it 
upwards for higher volume. When the desired 
volume is reached, tighten the horn clamp 
screws again.

 

 

 

ELECTRICAL CONNECTIONS

 

  Using a 20A inline fuse (not provided), connect the positive wire (RED/WHITE) to the (+) 12-volt positive 

power source of your vehicle, such as, the battery, alternator, accessories, etc. 

  If the horn's bracket was not grounded during the mounting process, find a 16 gauge electric wire and attach 

it to one of the mounting bracket screws. Make sure to tighten the screw with the stripped wire end to the 
surface. Connect the other stripped end of the electric wire to any metal surface on your vehicle that is clean 
of paint and rust. 

 

Отзывы: