VXF1GP2R
INSTALLATION GUIDE
PAGE 1 of 2
BEFORE BEGINNING YOUR INSTALLATION
Read through the instruction guide before getting started with the installation. Professional installation is recommended for
this product.
CONTENTS
Single Gauge Black Powder Coated Metal Dash Panel
Two 3-Position Momentary Rocker Switches (Pre-installed)
SAFETY INSTRUCTIONS
Make sure your battery ground is detached before getting your installation started.
Employ equipment for eye protection during drilling operations.
IMPORTANT:
If the vehicle is dropped or raised too fast when activating the valve using the switch, a flow control
valve (not provided) can be installed to reduce the air intake or exhaust of the air spring.
ROCKER SWITCH WIRING AND PANEL INSTALLATION
Connect the "two lines" connector to the positive (+) wire
of the air valve that is going to fill air into the air spring.
Connect the "O" connector to the 12V, you may use the
same wire that you used to connect the positive wire of
the gauge's bulb.
Connect the "one line" connector to the positive (+) wire
of the air valve that is going to dump air from the air
spring.
Install your air gauge on the panel.
Using the dash panel's screw holes as a template mark
the screws hole location on the surface to be installed
and secure the panel with two screws (not provided).