
6
STEP 5
Place one gray nail
(F3)
on one end of the bottom bar and hammer into the end
panel. Hammer another nail on the opposite end of the bottom bar in the same
manner. This will ensure that the frame will not pull apart until it is glued in by the
bees with propolis.
Side View of
Bottom Bar
with 2 long
nails nailed
down into side
panels
Aerial View of
Bottom Bar with 2
long nails nailed
down into side
panels
STEP 4
Place two gray nails
(F3)
at one end of the top bar, spaced evenly, and hammer
into the end panels. Hammer another two gray nails on the opposite end of the
top frame bar in same manner.
Aerial View of Top
Bar with 2 long
nails nailed down
into side panels
Side View of
Top Bar with
2 long nails
nailed down
into side panels