background image

7

Step 1 & 2

HOLE POSITION

 & PLACEMENT

Wood Stakes

Determine the area you want to start building your arbor. At one end 
of the desired area, hammer one wooden stake into the ground, tie 
a piece of string around it and measure to a length of 66” (167.6cm). 
This is where your second wood stake needs to be hammered into 
the ground. You have now set up your wood stakes and ready to 
excavate your holes

String Line

3”

24”

(61CM)

1

2

3

With your wood stakes in position 
aligned by the string and you 
have determined the location of 
where you want your posts to be, 
excavate 10” (25.4cm) diameter x 
36” (91.4cm) deep post holes.

After holes are dug and cleaned, place the 

4x4 (10cmx10cm) wood post into the hole 

ensuring it’s level and square to string lines.  

The final post height should be 24” (61cm) 

out of the ground. If a post is higher 

because of obstructed excavation of 
footings, please cut down the height 

accordingly.

 Fill the vacant hole with pre-

mixed concrete all the way to 

within 3” (7.6 

cm) of the top of the hole.

 

Once

concrete has set,

 

backfill and

compact the

3” (7.6 cm) space with soil.

36”

(91CM)

Post location and placement is the most critical step in the 
overall installation process.  Please double check for the 
possibility of any underground utilities such as sprinkler, 
gas or telephone lines. Make sure that your wood posts are 
straight using a level.

Содержание VA68896

Страница 1: ...Wildwood Arbor VA68896 ASSEMBLY GUIDE VER 1 4 Mar 10 2021...

Страница 2: ...oid scratching We recommend a 15 x 15 area for unobstructed assembling You should not need to use excessive force when assembling any components TOOLS YOU WILL NEED TOOLS YOU MAY NEED CAUTION PLEASE N...

Страница 3: ...STANCE BETWEEN WOOD POSTS INSTALLING WOOD SUPPORTING POSTS INTO GROUND GUIDE POST OPENING ONTO MOUNTING POST ATTACHING CARRY BEAMS TO POSTS ATTACHING BEAM ENDS TO BEAMS ATTACHING FULLY ASSEMBLED BEAMS...

Страница 4: ...Beam End Right x2 1 1 2 x 6 x 19 3 81cm x 15 24cm x 48 26cm 4 12018 Carrying Beam x4 1 1 2 x 6 x 30 3 81cm x 15 24cm x 76 2cm 5 12020 Beam x2 1 1 2 x 6 x 70 3 81cm x 15 24cm x177 8cm 6 12019 Post x2...

Страница 5: ...5 MATERIALS BREAK DOWN 1 4 7 2 3 12016 FILTER X7 12018 CARRYING BEAM X4 12020 BEAM X2 SOCKET DRIVER X1 12017 BEAM END LEFT X2 12019 POST X2 12021 BEAM ENDS RIGHT X2 6 5 8 STAIN 9 WRENCH X1...

Страница 6: ...n in half making two 5 posts Purchase at local building centre QUANTITY x1 1 2 Concrete Ready Mix Purchase at your local building centre QUANTITY x1 x2 Wood Stakes and x1 small roll of String Purchase...

Страница 7: ...diameter x 36 91 4cm deep post holes After holes are dug and cleaned place the 4x4 10cmx10cm wood post into the hole ensuring it s level and square to string lines The final post height should be 24...

Страница 8: ...n and placement is the most critical step in the overall installation process Please double check for the possibility of any underground utilities such as sprinkler gas or telephone lines Make sure th...

Страница 9: ...9 Step 3 GUIDE POST OPENING ONTO MOUNTING POST GROUND...

Страница 10: ...10 Step 4 ATTACHING CARRY BEAMS TO POSTS 9 24CM X8...

Страница 11: ...11 Step 5 ATTACHING BEAM ENDS TO BEAMS 1 1 2 5CM X16 Repeat for second beam once completed...

Страница 12: ...12 Step 6 ATTACHING FULLY ASSEMBLED BEAMS TO POSTS 2 3 8 6CM X8...

Страница 13: ...13 Step 7 ATTACHING FILTERS TO BEAMS 2 3 8 6CM X14...

Страница 14: ...14 We re here for you If you have any questions at all don t hesitate to contact us NORTH AMERICA TOLL FREE 1 800 282 9346 Visit our website to chat with a support technician www wearevita com...

Отзывы: