STEP FIVE
Temporarily position post caps on bottoms of arches.
With a helper, insert the bottom of the arches into the
posts until the arch rest on the stopper bolts.
Slide post caps down into position.
Install long screws into the two pre-drilled holes per posts.
Connect the Arch System
to the Side Panels
1
2
STEP SIX
Ensure that posts and side panels are level.
Fill around the posts with wet cement within 3 in. (7.6 cm.)
of your natural elevation.
Complete a final level check both horizontally and vertically.
and backfill the remaining space between concrete and
natural elevation with topsoil.
Fill Excavated Holes
1