background image

1

Step 1A

Position the pre-assembled side

panel upside down as illustrated

and insert the top front or back

panel into the post as shown,

followed by two middle and

bottom panels. 

Please note the difference

between the Top Panel and

the two Middle and Bottom

Panels.

Step 1B

Attached the second side panel

until all the rails bottom out inside

the post groove.

6

Top Panel

(No tounge)

Greens Urban Garden 

Содержание Greens Urban Garden VT17002

Страница 1: ...4 x 2 x 15 1 2 1 2 m x 0 6 m x 39 cm Instruction Manual GARDENS Greens Garden The world needs vegetables Rev 3 3 Apr 10 2017 ...

Страница 2: ... 5 Far easier on your back Warranty We want you to know that your new garden has a 10 year warranty against 1 Yellowing 2 Rotting Maintenance is non existent as a simple spray with a garden hose will clean the bed from dirt so you can spend more time growing food than maintain ing your garden beds If you have any questions about your warranty or with your product please call our customer service d...

Страница 3: ...ginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 4 x 8 1 2 m x 2 4 m for unobstructed assembling You should not need to use excessive force when assembling components 2 Not To Scale 1 6 4 1 Pre assembled Side Panels 2 2 Front and Back Panel Boards 2 3 Front and Back Panel Boards Middle and Bottom 4 4 Pre as...

Страница 4: ...Dimensions 4 x 23 x 15 1 2 1 2 m x 0 6 m x 39 cm Greens Urban Garden 4 Greens Urban Garden 23 in 58 5 cm 44 in 112 cm 48 in 122 cm 15 1 2 in 39 cm ...

Страница 5: ...miculite to 1 3 Compost to 1 3 Peat Moss or Coconut Coir 3 Plant your veggies Your local nursery for the best vegetables for the growing zone that you live in If you have any assembly installation or warranty issues please call us toll free at 1 844 880 VITA 8482 between 8 00 AM 4 30 PM Monday to Friday EST UK Tel 44 2038 687160 Mon to Fri 1 00 PM to 10 00 PM GMT You ll get a real live person and ...

Страница 6: ...t or back panel into the post as shown followed by two middle and bottom panels Please note the difference between the Top Panel and the two Middle and Bottom Panels Step 1B Attached the second side panel until all the rails bottom out inside the post groove 6 Top Panel No tounge Greens Urban Garden ...

Страница 7: ...2 Step 2A Fasten the posts and panels together using 12 of the short screws as illustrated Step 2B Repeat steps 1 and 2 for other side panel 7 Greens Urban Garden ...

Страница 8: ... legs as shown Measure 11 5 8 29 5 cm from the top and place a support rail as illustrated Step 3B Level the support rail and fasten with 5 of the long screws through the pre drilled holes Repeat for second support rail 8 Greens Urban Garden 11 5 8 29 5 cm ...

Страница 9: ...e pre assembled floor boards in the order shown Note the difference between the floor boards 9 Insert 1st Insert 2nd 3rd 4th 5th 6th and 7t h Insert last Greens Urban Garden Insert 1st Insert 2nd 3rd 4th 5th 6th and 7th Insert last ...

Страница 10: ...www vitagardens com ...

Отзывы: