w w w . c l a s s i c
e x h i b i t s . c o m
Step 2
Page 2 of 3
866.652.2100
© 2013
WHEN DISASSEMBLING ALUMINUM EXTRUSION, TIGHTEN ALL
SETSCREWS AND LOCKS TO PREVENT LOSS DURING SHIPPING
Order #XXXXX - Backwall Assembly
Steps:
1) Connect horizontals [13a,13b] between verticals [4,11].
2) Connect horizontals [14a,14b] between verticals [11,12].
3) Attach boomerang foot to outside of vertical [12] as shown.
4) Attach graphics to SEG groove on assembled backwall as
shown in general information pages.
4
11
12
14a
14b
13a
13b
Item
Qty. Description
11
1
96” Q914 Vertical Extrusion
12
1
96” Q914 Vertical Extrusion
13a/13b
1
64” Z45 Horizontal Extrusion
14a/14b
1
64” Z45 Horizontal Extrusion
SEG Groove faces front