![Vision Tech VDA140 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/vision-tech/vda140/vda140_instruction-manual_1032153005.webp)
8
9
5. Installation
5. Installation
① Paste a Drilling Template on the ceiling and drill screw points which will be done
for
installation.
② Fix a Flush Mounting Base on the ceiling by using Tapping Screws with Ø4
provided.
③ Point a Camera Ball to a desired direction and assemble a dome cover to the
Flush
Mounting Base with Socket Screws by using L-Wrench provided.
B. Flush Mount
Power
Video
Ceiling Tile
Drilling template
Flush Mount Base
Camera Set
Dome-Ass'y
L-Wrencher 3.0mm
Tapping Screw
Ø4*30L-4EA
Socket Head Screw
M4*P0.7*10L-3EA
2) Junction Boxes
3) Waterproof processing of cable connection
Flush Mount Base
Surface Mount BASE
2 gang Junction box
(Industrial standard)
Fixed Screw-4EA
PH MS M4*P0.7*20L
① Fix a Surface Mounting Base or a Flush Mounting Base to 2 Gang Junction Box by
using Fixed Screws with M4 provided.
Make sure to use a butyl tape. (Do not use a sealing material on those parts)
① It is useful to connect the cable ends from camera to the extension cable for
waterproof.
② Connect and tape the power cables (Power-Power/Ground-Ground).
③ Bind the power cables together with the type.
When DC-Jack is used, tape the DC-DC joint.
④ Tape the BNC-BNC joint.
Power cable
Video output cable
(Red)
(Black)