LDLF60x540-R633/24V
Commissioning
6.2 Mounting the Device
NOTICE
Installation and connection operations may only be performed in the off and
de-energised state.
To mount the device, tapped holes are located at the sides.
3
2
1
1
12 x M3 tapped hole at the bottom
Maximum screw-in depth: 5.5 mm
2
6 x M3 tapped hole at both long sides
Maximum screw-in depth: 4.5 mm
3
2 x M3 tapped hole at both short sides
Maximum screw-in depth: 10.5 mm
© Vision & Control GmbH 2019
999.995.683.10-en-1.0
21