Starting up
• Ready the dispenser for operation in accordance with the supplied commissioning and
maintenance manual.
• Ensure that the mains adapter (C) is off circuit
• Plug in the connector (3) of the dispenser (D)
• Connect (4) the pressure adapter (E)
• Plug in the connector with time/pressure controller (F)
• Connect (2) the mains adapter (C)
• Plug the mains adapter into the mains supply
Notice:
The control unit is only ready for operation when the dispenser is connected.
• Fill the dispenser with medium as directed in its operating and maintenance
instructions.
5.3
Shutting down
The unit is shut down in reverse order of setting up.
Caution:
The dispenser lead (connector 3) may only be connected and disconnected
when the power supply is isolated. The electronics in the drive motor could be damaged
if this precaution is not taken.
Caution:
Do not switch on
control unit until medium has been delivered to it.
Otherwise there is a risk of
damage to the equipment.
Even a
short
test run can cause
irreparable damage to the stator.
Only use the original connection and cable between Dispenser (D) and plug (3).
C
D
E
230 V AC
F
2
4
A
3
Fig. 3 Connection schematic