
20 / 32
eco-PEN450
5.3
Stator change
All activities described below may only be carried out by authorised maintenance staff.
Preparation
Disconnect the dosing control unit from the power supply.
Unplug the power supply to the drive unit.
Shut down material supply (depressurise).
Relieve inlet pressure via bleed screw.
Remove material supply and seal openings with suitable plug.
5.3.1
Disconnecting the dosing unit and drive unit
Undo set screws (14).
Disconnect the dosing unit (20) and drive unit (11).
Remove the star-shaped coupling (5).
Fig. 6
11
5
14
20
14
Содержание preeflow eco-PEN450
Страница 1: ...OPERATION MAINTENANCE MANUAL eco PEN450 ...
Страница 30: ...30 32 INST 002748 A eco PEN450 Notes ...
Страница 31: ...31 32 INST 002748 A eco PEN450 Notes ...