13
leading edge of the red sector on the gauge
. Approximately 600 strokes will be required
to fully charge the pedestal.
Disconnect the hose
from the pedestal charging valve, but do not refit the Schrader
valve cap at this stage. Fit the hose in its stowage
.
Push the pump plunger fully down, push in the handle release button
and move the
to the vertical position, where it will lock the pump plunger in the closed posi-
tion.
Fold up both the feet
.
Vinten Portable Pump
(P.1)
(P.5)
(P.2)
(P.3)
(P.4)