14
1969 CAMARO
w/o FACTORY AIR
LOCATE THE #8 COMPRESSOR A/C HOSE. LUBRICATE (2) #8 O-RINGS (SEE FIGURE 1
) AND CONNECT
THE 135° w/ 134a SERVICE PORT FITTING TO THE #8 DISCHARGE PORT ON THE COMPRESSOR. ROUTE THE
STRAIGHT MALE FITTING TO THE #8 CONDENSER HARDLINE. SEE FIGURE 13, PAGE13. TIGHTEN EACH
FITTING CONNECTION AS SHOWN IN FIGURE 11b, PAGE 11.
LOCATE THE #10 COMPRESSOR A/C HOSE. LUBRICATE (2) #10 O-RINGS (SEE FIGURE 11a, PAGE 11) AND
CONNECT THE 135° FITTING TO THE #10 SUCTION PORT ON THE COMPRESSOR AND ROUTE THE STRAIGHT
FEMALE w/ 134a SERVICE PORT FITTING TO THE #10 EVAPORATOR HARDLINE COMING THROUGH THE FIREWALL
SEE FIGURE 13, PAGE 13 & FIGURE 14b, PAGE 15. TIGHTEN EACH FITTING CONNECTION AS SHOWN IN FIGURE
11b, PAGE 11.
(
NOTE: WRAP THE
#10
FITTING CONNECTION
S
WITH PRESS TAPE. SEE FIGURE 1
4
b, PAGE 15.
LOCATE THE #6 EVAP/DRIER HARDLINE AND LUBRICATE (2) #6 O-RINGS (SEE FIGURE 11a , PAGE 11) AND
CONNECT THE HARDLINE TO THE #6 HARDLINE COMING THROUGH THE CORE SUPPORT FROM DRIER. ATTACH
THE OTHER END OF THE HARDLINE WITH LUBRICATED O-RING TO THE #6 EVAPORATOR HARDLINE COMING
THROUGH THE FIREWALL. SEE FIGURE 13, PAGE13 & FIGURE 14b, PAGE 15. TIGHTEN EACH FITTING CONNECTION
AS SHOWN IN FIGURE 11b, PAGE 11. USE A #2 ADEL CLAMP TO SECURE THE #6 EVAP/CORE HARDLINE TO THE
INNER FENDERWELL AS SHOWN IN FIGURE 13 PAGES 13. SECURE THE ADEL CLAMP TO THE INNER FENDER USING
A 10-32 x ½” MACHINE SCREW AND NUT.
1a, PAGE 11
A/C HOSE INSTALLATION
STANDARD HOSE KIT
REFER TO SEPARATE INSTRUCTIONS INCLUDED WITH MODIFIED HOSE KIT.
MODIFIED A/C HOSE KIT
#6 EVAP
HARDLINE
(091692-FCL)
FIGURE 14
905070-VCZ-A
, 69 CAMARO w/o FAC. AIR INSTRUCTIONS PG 14 OF 20
11/22/05
#6 O-RING