A B
A B
Cut away only
the film*
8-Vertical / Horizontal Tail
Attach the Vertical Stabilizer and the Horizontal Stabilizer
Incorrect
Correct
Incorrect
A
A’
A=A’
A
A’
A=A’
/
B
B’
B=B’
/
Check the alignment of the horizontal stabilizer by measuring from a fixed point along the center line of the fuselage
to the leading edge on each side of the horizontal stabilizer. The distance must be equal on both sides. If not, adjust
the stabilizer until the measurements are the same.
1-Slide the vertical and horizontal stabilizer on the fuselage, use a
pencil to trace around the bottom and the top (horizontal stabilizer)
and the right and the left (vertical stabilizer) where they are meet
the fuselage.
2-Remove the vertical and horizontal stab-
ilizer from the fuselage. Careful cut
away the covering inside the lines which
were marked in steep 1
3-Slide the horizontal and vertical stabi-
lizer into the fuselage and adjust the ali-
gnment as described. Note: it is impor-
tant
to ensure that the horizontal stabilizer
is also level in regards to the fuselage.
B
B’
B=B’
Cut away only the film
both the left and right
side*
* WARNING: When removing any covering from
the airframe, please ensure that you secure the
cut edge with CA or similar cement. This will
ensure the covering remain tight.
Cut away only the
film both the top and
bottom*
X
To muffler
Filler tube
To engine
3x35mm screw
Rubber stopper
7-Fuel tank
Ensure that the fuel tank clunk does not touch the rear of the fuel tank.
Checking for leaks - block the vents and blow into the
feed - if in doubt submersing the tank in a blow of
water will show up any problems.
Blow
Water
2
1
3
After confirming the direction . Insert this assembly, clunk end
first, into the fuel tank and tighten and screw the fuel tank cap on
firmly.
Carefully install the fuel tank
to ensure that they will not
shift during flight (secure the
fuel tank in place using foam
padding).