
2
On-Wall Surface Mounting
2.1 On-Wall Surface Mount Backbox - TA-1
2.2 On-Wall Surface Mounting Procedure
1. Mount the backbox onto the wall
2. Fit the gasket onto the backbox with the ridged side facing down
–
Plug the Ethernet cable into the RJ-45 port on the station
3. Mount the Turbine station onto the backbox with the M5 fasteners provided
76 mm
150 mm
D6.5 mm
25 mm
120 mm
Mounting holes are to be drilled
as shown.
Max. recommended screw
diameter: ISO M6 or ANSI 1/4".
Screw length must be greater
than 25 mm or 1".
A4 stainless steel socket head
screws/bolts are recommended.
Max. recommended screw
head diameter: 9.5 mm or 3/8".
3”
5.90”
4.72”
1”
0.25”
D
Mounting Hole
Mounting Hole
Mounting Hole
Mounting Hole
Optional plastic washers for extra
protection against corrosive effects
between surfaces are provided.
They should be placed at the bottom
of the 4 mounting holes.
Grommets and an M20 cable gland
are provided.
cable holes
M20
M16
Surface Mount Back Box
Gasket
Turbine Station
1
2
3
Microphone
Camera
Lens
Plastic Washer
L
The Gasket MUST be
mounted to seal the
station!
L
Use the grommets and M20 cable gland
provided for the cable holes on the backbox
L
Ensure the station is
mounted vertically with the
microphone aperture facing
down.
L
Ensure there is enough
clearance under the station
so that the microphone
aperture is not smothered.
L
Place the plastic washers at the
bottom of the 4 mounting holes on
the back box.