ES-2226C User Manual
6
2. Installation
2-1. Starting ES-2226C Up
This section will give users a quick start for:
-
Hardware and Cable Installation
- Management Station Installation
- Software booting and configuration
2-1-1. Hardware and Cable Installation
At the beginning, please do first:
⇒
Wear a grounding device to avoid the damage from electrostatic discharge
•
Installing Optional SFP/GBIC
Fiber Transceivers to the ES-2226C L2
Managed Switch
Note: If you have no modules, please skip this section.
•
Connecting the SFP/GBIC Module to the Chassis:
The optional SFP/GBIC modules are hot swappable, so you can plug or unplug
it before or after powering on.
1. Verify that the SFP/GBIC module is the right model and conforms to the
chassis
2. Slide the module along the slot. Also be sure that the module is properly
seated against the slot socket/connector
3. Install the media cable for network connection
4. Repeat the above steps, as needed, for each module to be installed into
slot(s)
5. Have the power ON after the above procedures are done
Fig. 2-1 Installation of Optional SFP/GBIC Fiber Transceiver
Содержание ES-2226C
Страница 1: ......
Страница 2: ......
Страница 10: ......
Страница 16: ......
Страница 20: ...ES 2226C User Manual 4 Fig 1 5 Front View of 1000Base LX BiDi LC SFP Fiber Transceiver...
Страница 31: ...ES 2226C User Manual Publication date Aug 2008 Revision A4 15 Fig 2 8 the Login Screen for CLI...
Страница 75: ...Publication date March 2008 Revision A1 59 Fig 3 18...
Страница 145: ...ES 2226C User Manual Publication date Aug 2008 Revision A4 129 Fig 3 69...
Страница 155: ...ES 2226C User Manual Publication date Aug 2008 Revision A4 139 Fig 3 87 Fig 3 88 Fig 3 89...
Страница 170: ...ES 2226C User Manual 154 Fig 4 1 Fig 4 2...
Страница 290: ......
Страница 291: ......