background image

F

ig

u

re

 1

1

 F

as

te

n

in

g

 t

h

e

 t

w

o

 e

n

d

o

th

e

 R

o

o

f

C

o

v

er

F

ig

u

re

 1

2

  

In

st

a

ll

a

ti

o

n

 o

th

F

ro

n

Co

v

er

F

ig

u

re

 1

3

  

In

st

al

la

ti

o

n

 o

th

Ba

ck

 C

o

v

er

3

2

3

1

3

5

Содержание JIT-2359J

Страница 1: ...SHELTER MODEL JIT 2359J L18 0xW7 0xH4 8m Assembly Manual www vikre no...

Страница 2: ...snow drifts n slippery places or in wet location The cover of the building will protect against normal falling leaves and light debris however large fast or sharp falling items etc may cause a punctur...

Страница 3: ...me and the tensioning equipments be well fixed When taking off the cover make sure the related ropes etc Be taken off and the cover will not be blocked during the way Avoid taking off the cover with h...

Страница 4: ...Base plate at front panel 2 9 Base plate at back panel 2 10 Door beam 1 1 11 Upper door track 2 12 Lower door track 1 12A Lower door track to connect the lower beam 1 13 Upper beam of front panel 2 13...

Страница 5: ...over 1 32 Back cover 1 34 Band for tie down ratchet 20 35 Rope for fastening the two ends of roof cover the front door back cover 11 36 Plastic cap for tensioning tube 10 37 Door dropping tube in the...

Страница 6: ...1 2B 3B 2 3 4 5 6L 6R 7R 7L 8 9 10 11 12 12A 13 13A 14 15 16 17 20 21 3B 25 2B 4 26 Figure 1 Sketch of JIT 2359J 2A 28 11 2A 3A 3C 5A...

Страница 7: ...langes with Stake Pegs Part 23 Measurements shown in Figure 2 are to the center of the upright sockets on each Base Flange The Shelter must be secured to a firm surface that can receive and retain aug...

Страница 8: ...nel frame According to Figure 5 6 connect the end wall frame by Using the bolts with washers and nuts through predrilled holes in frame members Do not tighten down the nuts completely until frame is f...

Страница 9: ...ly continues Next stand first interior arch up to repeat insertion into Base flanges Immediately after putting first interior arch into place connect Front Arch and Interior arch using Roof Purlin Tub...

Страница 10: ...Cover unpack cover and lay parallel to building frame on one side Cover must be pulled over top of frame assembly without being snagged or stressed on any frame members Use multiple ropes over top of...

Страница 11: ...ep Step 7 TIGHTEN ROOF COVER ON FRAME FRONT TO BACK The roof cover is tensioned from front to back by the rope lacing to grommet flaps inside the main cover inside the unit at both front and rear arch...

Страница 12: ...Figure 11 Fastening the two ends of the Roof Cover Figure 12 Installation of the Front Cover Figure 13 Installation of the Back Cover 32 31 35...

Страница 13: ...cket on one side The rope ties off to the loop that is located on the Base Flange in Corner part 6 Moving to the other side begin to pull the rope down Hold the rope in hand and push down at the botto...

Страница 14: ...t install the steel wire that leads from the bottom of the door dropping tubes to the door winching assembly Take one of the Steel Wires in the Door kit and feed down from the top of the Door track to...

Отзывы: