Figure 2 Position of Base Flanges
Begin by determining exact
location of the four (4) corners of
the building. Mark front edge and
side-to-side width of assembly on
ground. Drive alignment stakes
into the ground outside of the
markings, and draw alignment
strings along both ends and sides
of the building to the dimensions
shown in Figure 2. The outline of
the strings will represent the final
location of the base flanges. The
initial location of each Corner
Base Flanges(part #6L
&6R
) is
critical to the alignment and fit of
the frame components and cover.
Step #1 --SECURING BASE FLANGES
Sit the building boxes in the chosen location. Remove all the components from
packaging to ensure all components are present by checking with the Part List.
6L
6R
2.0m
2.0m
2.0m
2.0m
2
.2
9m
7R
8
3
.7m
Diagonals are equal
10.0m
2.0m
F
R
O
NT
7m
7L
9
1
.6
5m
1
.6
5m
Locate the Left Corner Base Flange and
Right Corner Base Flange(part
#6L&6R). Secure the base flanges with
Stake Pegs (Part #23). Measurements
shown in Figure 2 are to the center of the
upright sockets on each Base Flange.
The Shelter must be secured to a firm
surface that can receive and retain augers
and pegs firmly in position. The shelter
should be installed on FIRM GROUND,
not on SWAMP, SOFT/WET
GROUND. The Base Flanges must be
secured so they cannot be moved.
Arches are tensioned at their base as
they insert into the Base Plate sockets.
2
.3
55m
2
.3
55m
23
Figure 3
As Figure 3 shows, each base
flange is equipped with three
stake pegs.