background image

STANDARD RESPONSE 

FUSIBLE LINK UPRIGHT 

SPRINKLER VK108 (K5.6)

TECHNICAL DATA

Page 5 of 5

Form No. F_052214    21.09.29     Rev 21.1

The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058

Telephone: 269-945-9501  Technical Services: 877-384-5464  Fax: 269-818-1680  Email: [email protected]

Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com

Approval Chart 2 (FM)

Standard Response Upright Sprinkler VK108

 

Maximum 175 PSI (12 bar) WWP

Sprinkler Base 

Part Number

1

SIN

Thread Size

Nominal K-factor

Overall Length

FM Approvals

(Refer also to Design Criteria below.)

NPT

BSPT

U.S.

metric

2

Inches

mm

Standard Orifice

12973

VK108

1/2”

15 mm

5.6

80.6

2-1/4”

58

A1

NOTICE - Product Below - Limited Availability (Contact Local Viking Office)

05557

VK108

1/2”

15 mm

5.6

80.6

2-1/4”

58

A1

Approved Temperature Ratings

A - 165 °F (74 °C), 220 °F (104 °C), and 286 °F (141 °C)

Approved Finishes

1 - Brass, White Polyester

4

, Black Polyester

4

, and ENT

Footnotes

1

 Base part number is shown. For complete part number, refer to Viking’s current price schedule.

2

 Metric K-factor shown is for use when pressure is measured in bar. When pressure is measured in kPa, divide the metric K-factor shown by 10.0. 

3

 This table shows the listings and approvals available at the time of printing. Check with the manufacturer for any additional approvals.

4

 Other colors are available on request with the same Approvals as the standard colors.

DESIGN CRITERIA - FM

 

(Also refer to Approval Chart 2.)

FM Approval Requirements:

 

Sprinkler VK108 is FM Approved as a standard response Non-Storage upright sprinkler as indicated in the FM Approval Guide. For specific application 

and installation requirements, reference the latest applicable FM Loss Prevention Data Sheets (including Data Sheet 2-0). FM Global Loss Prevention 

Data Sheets contain guidelines relating to, but not limited to: minimum water supply requirements, hydraulic design, ceiling slope and obstructions, 

minimum and maximum allowable spacing, and deflector distance below the ceiling.

NOTE: The FM installation guidelines may differ from cULus and/or NFPA criteria.

IMPORTANT: Always refer to Bulletin Form No. F_091699 - Care and Handling of Sprinklers. Also refer to Form No. F_080614 

for general care, installation, and maintenance information. Viking sprinklers are to be installed in accordance with the latest 

edition of Viking technical data, the appropriate standards of NFPA, FM Global, LPCB, APSAD, VdS or other similar organiza-

tions, and also with the provisions of governmental codes, ordinances, and standards, whenever applicable.

 

Replaces Form No. F_052214 Rev 19.2

(Removed Cap render in Figure 1.)

Содержание VK108

Страница 1: ...r shown by 10 0 Material Standards Frame Casting Brass UNS C84400 Deflector Brass UNS C23000 or Copper UNS C19500 Fusible Link Assembly Brass UNS C40500 and UNS C51000 NOTE For chrome sprinklers the fusible link assembly is painted silver for decorative purposes only Belleville Spring Sealing Assembly Nickel Alloy coated on both sides with PTFE Tape Screw Brass UNS C36000 Seat Copper UNS C11000 Pi...

Страница 2: ...the pip cap and spring are released and the waterway is opened Water flowing through the sprinkler orifice strikes the sprinkler deflector forming a uniform spray pattern to extinguish or control the fire 6 INSPECTIONS TESTS AND MAINTENANCE Refer to NFPA 25 for Inspection Testing and Maintenance requirements 7 AVAILABILITY The Viking Standard Response Fusible Link Upright Sprinkler VK108 is availa...

Страница 3: ... Wax 220 F 104 C Dark Brown Wax4 Footnotes 1 The sprinkler temperature rating is stamped on the deflector 2 Based on NFPA 13 Other limits may apply depending on fire loading sprinkler location and other requirements of the Authority Having Jurisdiction Refer to specific installation standards 3 The corrosion resistant coatings have passed the standard corrosion test required by the approving agenc...

Страница 4: ...k with the manufacturer for any additional approvals 4 Listed by Underwriters Laboratories Inc for use in the U S and Canada 5 cULus Listed as corrosion resistant 6 Other colors are available on request with the same Listings and Approvals as the standard colors DESIGN CRITERIA UL Also refer to Approval Chart 1 cULus Listing Requirements Viking Standard Response Fusible Link Upright Sprinkler VK10...

Страница 5: ...e shows the listings and approvals available at the time of printing Check with the manufacturer for any additional approvals 4 Other colors are available on request with the same Approvals as the standard colors DESIGN CRITERIA FM Also refer to Approval Chart 2 FM Approval Requirements Sprinkler VK108 is FM Approved as a standard response Non Storage upright sprinkler as indicated in the FM Appro...

Страница 6: ...stall sprinklers onto piping at the floor level Install sprinklers after the piping is in place to prevent mechanical damage DO NOT allow impacts such as hammer blows directly to sprinklers or to fittings pipe or couplings in close proximity to sprinklers Sprinklers can be damaged from direct or indirect impacts DO NOT attempt to remove drywall paint etc from sprinklers Take care not to over tight...

Страница 7: ...D CAPS MUST BE REMOVED FROM SPRINKLERS BEFORE PLACING THE SYSTEM IN SERVICE Figure 1 Sprinkler shield being removed from a pendent sprinkler Figure 2 Sprinkler cap being removed from a pendent sprinkler Figure 3 Sprinkler cap being re moved from and upright sprinkler HOW TO REMOVE SHIELDS AND CAPS No tools are necessary to remove the shields or caps from sprinklers DO NOT use any sharp objects to ...

Страница 8: ... these sprinklers NOTE The protective cap is temporarily removed during installation and then placed back on the sprinkler for protection until finish work is completed Do not over tighten the sprinklers into fittings during installation Do not use the sprinkler deflector to start or thread the sprinklers into fittings during installation Do not attempt to remove drywall paint etc from the sprinkl...

Страница 9: ...t the corrosion resistant properties of the sprinkler Use care when locating sprinklers near fixtures that can generate heat Do not install sprinklers where they would be exposed to temperatures exceed ing the maximum recommended ambient temperature for the temperature rating used Inspect the coated sprinklers frequently soon after installation to verify the integrity of the corrosion resistant co...

Страница 10: ...ction of fire protection products are provided herin as they relate to legally mandated jurisdictional regions WARNING STATE OF CALIFORNIA USA Installing or servicing fire protection products such as sprinklers valves piping etc can expose you to chemicals including but not li mited to lead nickel butadiene titaninum dioxide chromium carbon black and acrylonitrile which are known to the State of C...

Отзывы: