![Viking RDMOS201SS Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/viking/rdmos201ss/rdmos201ss_service-manual_1025008019.webp)
19
RDMOS201SS
H BLOWN MONITOR FUSE TEST
TEST PROCEDURES
PROCEDURE
LETTER
COMPONENT TEST
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. If the monitor fuse is blown when the door is opened, check the primary switch and monitor switch
according to the "TEST PROCEDURE" for those switches before replacing the blown monitor fuse.
CAUTION: BEFORE REPLACING A BLOWN MONITOR FUSE, TEST THE PRIMARY SWITCH AND
MONITOR SWITCH FOR PROPER OPERATION.
If the monitor fuse is blown by improper switch operation, the monitor fuse and monitor switch must
be replaced with "monitor fuse and monitor switch assembly" part number FFS-BA016/KIT, even if
the monitor switch operates normally. The monitor fuse and monitor switch assembly is comprised
of a 20 ampere fuse and switch.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
unlike conventional microwave ovens, proper maintenance cannot be performed with only a voltmeter
and ohmmeter. In this service manual, the touch control panel assembly is divided into two units, Con-
trol Unit and Key Unit, and also the Control Unit is divided into two units, LSI Unit and Power Unit, and
troubleshooting by unit replacement is described according to the symptoms indicated.
Before testing,
1) Disconnect the power supply cord, and then remove outer case.
2) Open the door and block it open.
3) Discharge high voltage capacitor.
4) Disconnect the leads to the primary of the power transformer.
5) Ensure that these leads remain isolated from other components and oven chassis by using insulation
tape.
6) After that procedure, re-connect the power supply cord.
1. Key Unit.
NOTE ;
1) Disconnect the power supply cord, and then remove outer case.
2) Open the door and block it open.
3) Discharge high voltage capacitor.
4) Check Key unit ribbon connection before replacement.
5) Reconnect all leads removed from components during testing.
6) Re-install the outer case (cabinet).
7) Reconnect the power supply cord after the outer case is installed.
8) Run the oven and check all functions.
I TOUCH CONTROL PANEL ASSEMBLY TEST
The touch control panel consists of circuits including semiconductors such as LSI, ICs, etc. Therefore,
3. Discharge high voltage capacitor.
4. Before performing this test, make sure that the primary switch is operating properly, according to the
above Switch Test Procedure. Disconnect the wire lead from the monitor switch (COM) terminal. Check
the monitor switch operation by using the ohmmeter as follows. When the door is open, the meter should
indicate a closed circuit. When the monitor switch actuator is pushed by a screw driver through the lower
latch hole on the front plate of the oven cavity with the door opened (in this condition the plunger of the
monitor switch is pushed in), the meter should indicate an open circuit. If improper operation is indicated,
the switch may be defective. After testing the monitor switch, reconnect the wire lead to the monitor switch
(COM) terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from
components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord
after the outer case is installed.
8. Run the oven and check all
functions.
Monitor
Switch
Primary Interlock Switch
Screw Driver
Ohmmeter
RED
WHT/WHT
Secondary Interlock Switch
Содержание RDMOS201SS