
E10
Installation Instructions for Flush Mount
1. Install mounting brackets 19
1
/
4
" with the 8 wood screws provided. Locate position, center punch and drill pilot
hole
1
/
8
". See Figure 9.
90˚
*Note:
Square the mounting bracket
to the opening and shelf
19
1/4
"
(488.9 mm)
9
5/8
"
(244.5 mm)
CL
Front of flange even
with front of the platform
19
1/4
"
Front of flange even
with front of surface
of the installed
block
Note: Platform must be
able to support 70 lbs
(31.75 kgs).
*90˚
Figure 9