![Viking Range DDBB363 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/viking-range/ddbb363/ddbb363_installation-instructions-manual_1026351033.webp)
33
WATER CONNECTION
•Refer to water supply requirement section for preliminary installation and site preparation (see page7 ).
••D
Do
o n
no
ott u
usse
e p
pllaassttiicc w
waatte
err lliin
ne
ess b
be
ettw
we
ee
en
n rre
effrriig
ge
erraatto
orr aan
nd
d ssu
up
pp
pllyy.. P
Pllaassttiicc w
waatte
err lliin
ne
ess ccaan
n ffaaiill d
du
ue
e tto
o ffaattiig
gu
ue
e o
ovve
err ttiim
me
e
aan
nd
d ccaau
usse
e e
exxtte
en
nssiivve
e d
daam
maag
ge
e tto
o p
prro
od
du
ucctt aan
nd
d tth
he
e h
ho
om
me
e..
••U
Usse
e o
on
nllyy 1
1//4
4"" cco
op
pp
pe
err ttu
ub
biin
ng
g ffo
orr w
waatte
err lliin
ne
e..
•The installation of Viking refrigerator with an reverse osmosis system is acceptable aass llo
on
ng
g aass tth
he
e w
waatte
err p
prre
essssu
urre
e
rre
em
maaiin
nss w
wiitth
hiin
n tth
he
e aallllo
ow
waab
blle
e P
PS
SII aass ssttaatte
ed
d o
on
n p
paag
ge
e 7
7.. It is important to note that with many reverse osmosis systems,
the pressure starts off high, but then it decreases as the water level of the reverse osmosis storage area drops. This
must be considered when checking the water pressure coming into the unit.
The 1/4" brass compression union is located in the literature packet.
1. Pull copper supply tubing from plumbing forward from underneath unit (see Figure A).
2. Flush air and impurities from water line by turning on water supply and running two (2) quarts (1.9 L) of water into a
bucket.
3. Bend the open end of the supply tube to point toward the open end of the Water Valve Tube (see Figure B). Note:
The Water Valve Tube is designed to flex or bend as necessary to line up with the supply tube, so union can be
connected easily.
4. Remove brass nuts and ferrules from union and slide onto open ends of Water Valve Tube and supply tubing (see
Figure C).
5. Connect nuts on copper tubing to union (see Figure D). Be sure both nuts are fully seated in union before tightening
nuts. Do Not over tighten.
6. Turn on water supply to unit and check for leaks.
7. Turn off water supply to unit and correct any leaks. Repeat this process until no leaks exist.
8. Completely turn on water supply to unit.
9. Verify drain pan is installed and aligned. Drain pan must be pushed past and over initial stopping point.
Figure A
Figure B
Copper tubing
Water valve tube
Figure D
Figure C
Brass nuts and
ferrules
Содержание DDBB363
Страница 10: ...10 DOOR SWING CONSIDERATIONS DESIGNER MODEL FULL OVERLAY MODEL...
Страница 11: ...11 TIPPING CONSIDERATIONS PROFESSIONAL MODELS DESIGNER AND FULL OVERLAY MODELS 82 5 8 209 9 cm 86 1 16 218 6 cm...
Страница 14: ...14 CABINET INFORMATION PROFESSIONAL MODELS Cont d...
Страница 15: ...15 CUSTOM SIDE PANEL DIMENSIONS PROFESSIONAL MODELS FOR 3 4 1 9 cm SIDE PANELS...
Страница 21: ...21 CUSTOM PANEL DIMENSIONS...
Страница 24: ...24 Z BRACKET INSTALLATION...