background image

 

 

VZ-AM03

VZ-AM03 

INSTALLATION INSTRUCTIONS

Wall Mount with level, rotation and tilt adjust

[email protected]

www.ViewZUSA.com

1-714-996-1177

Содержание VZ-AM03

Страница 1: ...VZ AM03 VZ AM03 INSTALLATION INSTRUCTIONS Wall Mount with level rotation and tilt adjust sales viewzusa com www ViewZUSA com 1 714 996 1177 ...

Страница 2: ... that the mounting screws are anchored into the center of the wall studs or ceiling studs Use of an edge to edge stud finder is recommended Using replacement parts or accessories other than from the manufacturer may void the warranty Be aware of the mounting environment If drilling and or cutting into the mounting surface always make sure that there are no electrical wires in wall Cutting or drill...

Страница 3: ...oduct is shipped with all proper installation hardware and components If there are parts missing and or damaged please stop the installation and contact ViewZ USA at 888 998 4399 A Arm and Wall Plate 1 pc D Monitor Bracket 1 pc M A Philips Screws M6 x 15mm 4 pc M B Philips Screws M6 x 30mm 4 pc B Front Support 1 pc E Lag Bolts 5 16 x 2 4 pc F Washers Ø8mm 4pc M C Philips Screws M8 x 15mm 4 pc M D ...

Страница 4: ... at the back of your monitor these measures may form the shape of a square or a rectangle and check that these taken measures are within the VESA range for this wall mount VESA International standard established by the monitor manufacturers used to determine if LCD LED TVs are compatible with wall mounts 1 Please select the proper screw length for your monitor by hand tightening to check your plat...

Страница 5: ...uds Mark the edge and center locations Ensure the marked point at the center of the stude 2 Use wall plate A to mark mounting locations 4 holes A A E F 3 Drill 4 point holes using a 7 32 5 5 mm diameter drill bit Make sure the depth is not less than 2 3 4 70 mm 4 Mount wall plate A using 4 sets of 5 16 lag bolts E and washers F with a 1 2 socket wrench not included ...

Страница 6: ... spanner G to remove the pre assembled nuts screws from the extensions B and keep them to re build Install Arm Extensions Installation 2 Insert the extension C into the B G G B B A B C C C 3 Fasten the nuts and screws 4 Hang B and C onto A then asseble them by using pre installed screws washers ...

Страница 7: ...viewzusa com VZ AM03 Installation Hang Monitor Secure Monitor 1 Hang monitor with brackets D onto the arm extensions B and C 1 Secure the monitor by using pre installed screws on D brackets against the arm extensions B and C A D B C Lock Screw driver Pre assembled screw ...

Страница 8: ...ose 4 pieces tilting nuts and move the monitor for desired position Use the spanner G or proper tool 1 To adjust the level of mount the monitor can be leveled as 3 degrees Pre assembled screw Tilt Adjustment Installation 2 After positioning tight the tilting nuts to hold position Loose 2 screws Level the monitor Tight 2 screws G 4 piece nuts ...

Страница 9: ...9 Installation Instructions Visit the ViewZ USA website at http www viewzusa com VZ AM03 Notes ...

Отзывы: