35
4.
Connect the Network and Power cables of the
Cabinets
to the
System Control
Box
.
NOTE:
There are four (4) Network and eight (8) Power cables to connect.
• Route the Power cable through the opening provided in the
Cabinet
and connect
it to the power plug.
• Route the Network cable through the opening provided in the
Cabinet
into an
“S-shape" and connect it to the network port.
5.
Install the bezels from the bottom of the screen and use the M6x10mm screws to
secure it to the
Cabinet
.
Содержание LDP216-121
Страница 58: ...58 11 After installing all the Cabinets the installation wall should look like...
Страница 80: ...80 Main Menu Sub menu Menu Option Upgrade OTA Upgrade OTA Cloud Server Local Update sda1 SDcard...
Страница 90: ...90 Sound Sub menu Description Media Volume Adjust the volume level of the display...
Страница 91: ...91 Storage Sub menu Description Internal Shared Storage Internal storage allocation...
Страница 95: ...95 Sub menu Description About Device View information about the display...
Страница 104: ...104 Menu Option Description Gamma Manually adjust the brightness level of the monitor s grayscale levels...
Страница 105: ...105 Menu Option Description Color Temp Manually adjust the red green and blue values...
Страница 106: ...106 Menu Option Description Reset Return the Display Mode settings to their default values...
Страница 113: ...113 Menu Option Description PIP PBP Setup PBP Display up to four 4 windows on screen at the same time...
Страница 119: ...119 Browser Web browser for surfing the Internet...
Страница 120: ...120 vSweeper Remove unnecessary data and unwanted files Advanced Settings can also be customized to the user s needs...
Страница 121: ...121 WPS Office Create edit and view Documents Memos Presentations and Spreadsheets...
Страница 131: ...131 Accessory Tool Online Service Address Compliance Information Imformation KG mm mm mm mm...