Centre the mounting rails, maintaining
dimension f = 81 mm.
3.
Fit clamping bolts onto the mount-
ing rails; do not yet tighten the
bolts.
4.
Click the mounting rails with tube
holders into the clamping bolts;
align and fasten.
Note
Tube holders on both rails must be
aligned.
Vertical roof top installation
(cont.)
15
58
62
790
GB
Содержание VITOSOL300
Страница 5: ...Component summary Vertical roof top installation 5 5862 790 GB ...
Страница 17: ...Component summary Installation on flat roofs 17 5862 790 GB ...
Страница 29: ...A Dual pipe heat exchanger B Clip C Template Water connections cont 29 5862 790 GB ...
Страница 33: ...33 5862 790 GB ...
Страница 34: ...34 5862 790 GB ...
Страница 35: ...35 5862 790 GB ...