66
■ Align the collector array to face due
south.
■ Calculation of ballast and max. load on
the substructure according to DIN
1055-4: 2005-03 and DIN 1055-5:
2005-07
Four support slabs are required for
each collector.
The Viessmann "SOLSTAT" calcula-
tion program is available at
www.viessmann.com
to assist with
calculations.
Horizontal installation
(cont.)
5513 008 GB
Содержание Vitosol 200-T
Страница 10: ...10 1 1 3 2 2 3 Pitched roof installation with rafter flanges cont 5513 008 GB ...
Страница 11: ...11 90 4 4 2 90 6 7 0 7 90 5 Pitched roof installation with rafter flanges cont 5513 008 GB ...
Страница 14: ...14 1 1 3 3 2 2 Pitched roof installation with rafter flanges cont 5513 008 GB ...
Страница 22: ...22 4 2 90 4 7 0 5 90 3 Pitched roof installation with rafter hooks cont 5513 008 GB ...
Страница 31: ...31 5 4 Pitched roof installation with rafter anchors cont 5513 008 GB ...
Страница 32: ...32 Installation with tile trimming 3 4 6 5 Pitched roof installation with rafter anchors cont 5513 008 GB ...
Страница 34: ...34 1 90 Pitched roof installation with rafter anchors cont 5513 008 GB ...
Страница 35: ...35 90 4 2 3 7 0 4 90 2 Pitched roof installation with rafter anchors cont 5513 008 GB ...
Страница 44: ...44 4 2 90 6 5 7 0 90 4 Pitched roof installation with mounting brackets cont 5513 008 GB ...
Страница 56: ...56 3 7 0 90 2 90 4 2 2 Pitched roof installation with roof hooks cont 5513 008 GB ...
Страница 69: ...69 2x 90 9 8 Continue with chapter Hydraulic con nections see page 70 Horizontal installation cont 5513 008 GB ...
Страница 75: ...75 2 2x 1 8 7 4 5 6 3 3 Nm Fitting the collector temperature sensor cont 5513 008 GB ...
Страница 79: ...79 For commissioning see the Vitosol T service instructions cont 5513 008 GB ...