
10
Fitting the first centre section and pressing the sections together
Applying sealant to sealing contour on 1st centre section
B
A
1.
2.
Fig. 6
A
Sealing contour on 1st centre section
B
Sealant supplied
Pressing the sections together
Danger
Escaping flue gas leads to breathing difficulties
and poisoning.
To prevent leaks, the sealant must not be
allowed to dry. Join the sections together no
later than 10 min after starting to apply it.
Handling the compression tool:
Compression tool installation instructions
Boiler section assembly
(cont.)
5592831