5
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Commissioning the system
...........................................
7
•
•
2. Shutting down the system
•
•
3. Closing the Vitoair draught stabiliser (if installed)
......
8
•
•
4. Opening the boiler door and cleaning cover
...............
8
•
5. Cleaning the internal pipes, heating surface, flue
outlet and flue
................................................................. 10
•
•
•
6. Checking all gaskets and packing cords on the flue
gas side
•
•
7. Checking the thermal insulation parts of the boiler
door
•
8. Inserting the internal pipes
............................................ 11
•
•
9. Securing the boiler door and cleaning cover
............... 12
•
•
•
10. Checking connections and sensor well for leaks on
the heating water side
•
•
•
11. Checking the function of the safety equipment
........... 12
•
•
•
12. Checking the diaphragm expansion vessel and
system pressure
............................................................. 13
•
•
•
13. Checking the firm seating of electrical plug-in
connections and cable grommets
•
•
•
14. Checking the thermal insulation
•
•
15. Checking the water quality
............................................ 14
•
•
16. Cleaning the sight glass in the boiler door
.................. 16
•
•
•
17. Checking the mixer for ease of operation and
tightness
.......................................................................... 16
•
•
•
18. Checking the function of the return temperature
raising facility (if installed)
•
•
•
19. Checking the installation room ventilation
•
•
•
20. Checking the flue pipe for tightness
Commissioning, inspection, maintenance
Steps – commissioning, inspection and maintenance
5692 818 GB