Clearance dimensions
(480)
520
b
420
(380)
(480)
520
(400)
510
1000
A
a
b
420
(380)
(400)
510
1000
A
a
B
B
Fig. 1
A
Required clearance for cleaning, heat-up and
recharging
B
The wall clearance can be reduced to 200 mm if
the ignition is
not
located on this side of the boiler.
Rated heating output
kW
20/30
40/50
Dim. a
mm
1020
1020
Dim. b
mm
640
640
Minimum room height
mm
1800
2100
Room height, recommended
mm
2300
2600
Dimensions in brackets: Boiler incl. thermal insulation
Note
The specified wall clearances are required for installa-
tion and maintenance work.
Installation room requirements
Installation location requirements:
■
The installation room must be dry and free from the
risk of frost.
■
Avoid high humidity levels (e.g. from continuous dry-
ing of washing).
■
Ambient temperatures between 0 and 35 °C
■
Ensure a supply of fresh air.
Danger
Suffocation hazard due to carbon monoxide
produced during incomplete combustion due
to lack of combustion air.
Ensure an adequate supply of fresh air. Never
cover or close vents.
Danger
Easily flammable liquids and materials can
cause deflagration and fires.
Do not store easily flammable substances in the
boiler installation room (e.g. petrol, solvents and
cleaning agents, paints, paper).
Floor condition
The boiler must be positioned on a non-combustible
substrate. Special foundations are not required.
Preparing for installation
Preparing for installation
5777 985 GB
Installation
Содержание VITOLIGNO 200-S
Страница 72: ...72 Maintenance Extension kit for heating circuit with mixer cont 5777 985 GB Maintenance ...
Страница 78: ...78 Parts lists Control unit assembly cont 5777 985 GB Components ...
Страница 106: ...106 5777 985 GB ...
Страница 107: ...107 5777 985 GB ...